Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14544
Well Classification: GW Status: SI - 8/1/2025
Well Name/No:N. PARACHUTE #CP12D-03 H04 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:291927LocationID:335907
County:GARFIELD #045Location:SENE 4 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8272 ft.
Basin:PICEANCE BASIN  
Planned Location:2151FNL  102 FELLat/Long: 39.645414 / -108.165192Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.645414 / -108.165190Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2025             Measured TD: 11410 ft.    Vertical TD: 11101 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20073344 Expiration Date:8/14/2008
Proposed Top PZ Location:Sec:3 Twp: 5S 96W Footage: 1659 FSL  998 FWL
Bottom Hole Location:Sec:3 Twp: 5S 96W Footage: 1659 FSL  998 FWL
Proposed Depth/Form:12479 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/16/2008
Spud Date:9/19/2007Spud Date Is:ACTUAL
Measured TD:11410 ft.Measured PB depth:11354 ft.
True Vertical TD:11101 ft.True Vertical PB depth:11045 ft.
Top PZ Location:Sec:3 Twp: 5S 96WFootage: 1659 FSL  998 FWL
Bottom Hole Location:Sec:3 Twp: 5S 96WFootage: 1659 FSL  998 FWL
Log Types:GR, RST, SM, GR-CCL, CBL, TEMP, GR-CCL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 92 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 92 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2035 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1226, Top: 0 ft., Bottom: 2035 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11400 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 278, Top: 6490 ft., Bottom: 11400 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8123 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 742, Top: 1835 ft., Bottom: 8123 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH3723 ft.NN
OHIO CREEK7069 ft.NN
WILLIAMS FORK7510 ft.NN
CAMEO10658 ft.NN
ROLLINS11248 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 8/1/2025                  Interval Top: 8178 ft.    Interval Bottom: 11072 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/19/2014Treatment End Date:N/A
Treatment Summary:RBP @ 8,079 removed on 09/02/2014. Well is returned to production.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/8/2008
Treatment Summary:48339 BBLS SLICKWATER, 151222 LBS 100 MESH, 202300 LBS 48/80 HYDROPROP; 650250 LBS 20/40 JORDAN-UNIMIN
Formation Treatment
Treatment Date:5/9/2008
Treatment Summary:48339 bbls slickwater, 151,222 lbs 100 Mesh, 202,300 lbs. 48/80 Hydroprop, 650,250 lbs 20/40 Jordan-Unimin, the original treatment start date was 6/8/2008 by the original operator ConocoPhillips Company, after review of the daily reports Encana found the treatment start date to be 5/09/2008.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_MCF_GAS 350
CASING_PRESS 2000
MCF_GAS 350
TUBING_PRESS 540
Perforation Data:
Interval Top:8178 ft.# Of Holes:237
Interval Bottom:11072 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)39
GOR
GOR DeterminationMCFE
Average BOE per Day0.019
Average MCFE per Day0.105

 Federal Financial Assurance  i 

 Tribal Well  i No