Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14542
Well Classification: GW Status: PR - 5/1/2025
Well Name/No:N. PARACHUTE #CP08D-04 H04 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:291929LocationID:335907
County:GARFIELD #045Location:SENE 4 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8273 ft.
Basin:PICEANCE BASIN  
Planned Location:2132FNL  96 FELLat/Long: 39.645467 / -108.165172Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.645466 / -108.165161Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2025             Measured TD: 11200 ft.    Vertical TD: 11184 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20073343 Expiration Date:8/14/2008
Proposed Top PZ Location:Sec:4 Twp: 5S 96W Footage: 2236 FNL  240 FEL
Bottom Hole Location:Sec:4 Twp: 5S 96W Footage: 2236 FNL  240 FEL
Proposed Depth/Form:12180 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/8/2008
Spud Date:9/14/2007Spud Date Is:ACTUAL
Measured TD:11200 ft.Measured PB depth:11161 ft.
True Vertical TD:11184 ft.True Vertical PB depth:11145 ft.
Top PZ Location:Sec:4 Twp: 5S 96WFootage: 2236 FNL  240 FEL
Bottom Hole Location:Sec:4 Twp: 5S 96WFootage: 2236 FNL  240 FEL
Log Types:CBL (2 - ONE W/TEMP-PLOT) + ISOLATION-SCANNER CEMENT-EVAL; MUD; GAMMARAY; RESERVOIR-SATURATION TOOL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 97 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2043 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1308, Top: 0 ft., Bottom: 2043 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8029 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 758, Top: 1796 ft., Bottom: 8029 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11162 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 282, Top: 8635 ft., Bottom: 11162 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH5512 ft.NN
WILLIAMS FORK7177 ft.NN
OHIO CREEK11200 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/1/2025                  Interval Top: 8640 ft.    Interval Bottom: 10711 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/19/2014Treatment End Date:N/A
Treatment Summary:RBP @ 8,567 removed on 09/16/2014. Well is returned to production.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/10/2008
Treatment Summary:Frac included: 42,061 bbls slickwater, 133,030 lbs. 100 Mesh sand, 248,330 lbs. 40/80 Hydroprop 512,400 lbs Jordan Unimin
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 450
CASING_PRESS 1800
MCF_GAS 450
TUBING_PRESS 740
Perforation Data:
Interval Top:8640 ft.# Of Holes:210
Interval Bottom:10711 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)42
Total Gas Produced (MCF)9552
GOR227428
GOR DeterminationMCFE
Average BOE per Day4.596
Average MCFE per Day26.654

 Federal Financial Assurance  i 

 Tribal Well  i No