Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14500
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:PUCKETT #42A-25D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:291728LocationID:335112
County:GARFIELD #045Location:SENE 25 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8165 ft.
Basin:PICEANCE BASIN  
Planned Location:1411FNL  1084 FELLat/Long: 39.497378 / -108.163235Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.497390 / -108.163220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 9007 ft.    Vertical TD: 9001 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20073048 Expiration Date:8/2/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1496 FNL  963 FEL
Bottom Hole Location:Sec:25 Twp: 6S 97W Footage: 1520 FNL  980 FEL
Proposed Depth/Form:9140 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/20/2007
Spud Date:10/8/2007Spud Date Is:ACTUAL
Measured TD:9007 ft.Measured PB depth:8940 ft.
True Vertical TD:9001 ft.True Vertical PB depth:8933 ft.
Top PZ Location:Sec:25 Twp: 6S 97WFootage: 1497 FNL  948 FEL
Bottom Hole Location:Sec:25 Twp: 6S 97WFootage: 1497 FNL  948 FEL
Log Types:PNDL/GR, PND-S CASED HOLE TRIPLE COMBP, CBL/GR, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2680 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 0 ft., Bottom: 2680 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8984 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4830 ft., Bottom: 8984 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4345 ft.NN
FORT UNION4669 ft.NN
WILLIAMS FORK6002 ft.NN
CAMEO8403 ft.NN
ROLLINS8845 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 7116 ft.    Interval Bottom: 8751 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/10/2008Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/23/2008
Treatment Summary:18,588 BBLS SLICKWATER GEL; 685,223 LBS 30/50 MESH WHITE SAND
Tubing Size:2.375 in.Tubing Setting Depth:8586 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 1
BTU_GAS 1067
CALC_BBLS_H2O 5
CALC_BBLS_OIL 1
CALC_GOR 720000
CALC_MCF_GAS 720
CASING_PRESS 998
MCF_GAS 720
TUBING_PRESS 805
Perforation Data:
Interval Top:7116 ft.# Of Holes:126
Interval Bottom:8751 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)5
Total Gas Produced (MCF)30599
GOR6119800
GOR DeterminationMCFE
Average BOE per Day14.490
Average MCFE per Day84.019

 Federal Financial Assurance  i Y

 Tribal Well  i No