Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14491
Well Classification: GW Status: PR - 7/6/2008
Well Name/No:N. PARACHUTE #EF10A-24E19 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/6/2008
FacilityID:291669LocationID:335579
County:GARFIELD #045Location:NWNW 19 5S95W 6
Field:GRAND VALLEY - #31290Elevation:5993 ft.
Basin:PICEANCE BASIN  
Planned Location:1300FNL  1312 FWLLat/Long: 39.602983 / -108.103931Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.602986 / -108.103943Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/6/2008             Measured TD: 10215 ft.    Vertical TD: 9098 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/6/2008
Wellbore PermitDIRECTIONAL
Permit #:20072969 Expiration Date:7/30/2008
Proposed Top PZ Location:Sec:24 Twp: 5S 96W Footage: 2504 FSL  1920 FEL
Bottom Hole Location:Sec:24 Twp: 5S 96W Footage: 2504 FSL  1920 FEL
Proposed Depth/Form:12153 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/31/2008
Spud Date:12/10/2007Spud Date Is:ACTUAL
Measured TD:10215 ft.Measured PB depth:10001 ft.
True Vertical TD:9098 ft.True Vertical PB depth:8884 ft.
Top PZ Location:Sec:24 Twp: 5S 96WFootage: 2504 FSL  1920 FEL
Bottom Hole Location:Sec:24 Twp: 5S 96WFootage: 2504 FSL  1920 FEL
Log Types:CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 123 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 123 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2513 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 2534 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10048 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1903, Top: 2000 ft., Bottom: 10050 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6449 ft.10227 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/6/2008                  Interval Top: 6576 ft.    Interval Bottom: 9871 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/14/2008Choke Size:0.344 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/20/2008
Treatment Summary:STAGES 1-10 TREATED WITH A TOTAL OF 50670 BBLS OF SLICKWATER, 386,000 LBS 20-40 SAND, 200,000 LBS 30-50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8520 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/6/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 45
BTU_GAS 1170
CALC_BBLS_H2O 45
CALC_MCF_GAS 1332
CASING_PRESS 1950
MCF_GAS 1332
TUBING_PRESS 1250
Perforation Data:
Interval Top:6576 ft.# Of Holes:300
Interval Bottom:9871 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)83
Total Gas Produced (MCF)14932
GOR179903
GOR DeterminationMCFE
Average BOE per Day7.282
Average MCFE per Day42.228

 Federal Financial Assurance  i 

 Tribal Well  i No