Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14465
Well Classification: GW Status: PR - 7/26/2007
Well Name/No:DIAMOND ELK #PA 324-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/26/2007
FacilityID:291574LocationID:335008
County:GARFIELD #045Location:NWSW 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6023 ft.
Basin:PICEANCE BASIN  
Planned Location:2180FSL  642 FWLLat/Long: 39.465680 / -107.954100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465680 / -107.954107Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/23/2007             Measured TD: 8375 ft.    Vertical TD: 7999 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/23/2007
Wellbore PermitDIRECTIONAL
Permit #:20072870 Expiration Date:7/25/2008
Proposed Top PZ Location:Sec: Twp: Footage: 904 FSL  2163 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 904 FSL  2163 FWL
Proposed Depth/Form:8386 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:4/29/2008
Spud Date:4/11/2008Spud Date Is:ACTUAL
Measured TD:8375 ft.Measured PB depth:8351 ft.
True Vertical TD:7999 ft.True Vertical PB depth:7975 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 939 FSL  2152 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 939 FSL  2152 FWL
Log Types:CBL, MUD, RES-MON-TOOL-ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2625 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 0 ft., Bottom: 2625 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8377 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 5185 ft., Bottom: 8377 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2222 ft.NN
MESAVERDE4806 ft.NN
CAMEO7232 ft.NN
ROLLINS8209 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2008                 Interval Top: 6460 ft.    Interval Bottom: 8132 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/17/2008Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/12/2008
Treatment Summary:3000 GALS 7.5% HCL; 736,400# 20/40 SAND; 17,760 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7644 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1394
MCF_GAS 1135
TUBING_PRESS 1169
Perforation Data:
Interval Top:6460 ft.# Of Holes:126
Interval Bottom:8132 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)9904
GOR707428
GOR DeterminationMCFE
Average BOE per Day4.717
Average MCFE per Day27.345

 Federal Financial Assurance  i 

 Tribal Well  i No