Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14464
Well Classification: GW Status: PR - 7/26/2007
Well Name/No:DIAMOND ELK #PA 23-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC53630
Facility Status:PRStatus Date7/26/2007
FacilityID:291575LocationID:335008
County:GARFIELD #045Location:NWSW 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6023 ft.
Basin:PICEANCE BASIN  
Planned Location:2200FSL  653 FWLLat/Long: 39.465736 / -107.954070Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465734 / -107.954070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/23/2007             Measured TD: 8321 ft.    Vertical TD: 8127 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/23/2007
Wellbore PermitDIRECTIONAL
Permit #:20072887 Expiration Date:7/25/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2467 FSL  2089 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 2467 FSL  2089 FWL
Proposed Depth/Form:8322 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:3/14/2008
Spud Date:2/27/2008Spud Date Is:ACTUAL
Measured TD:8321 ft.Measured PB depth:8285 ft.
True Vertical TD:8127 ft.True Vertical PB depth:8091 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 2480 FSL  2085 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 2480 FSL  2085 FWL
Log Types:CBL, MUD, HI-RES INDUCTION/SPECTRAL DENS./DUAL-SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2521 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 2521 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8324 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 3735 ft., Bottom: 8324 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2340 ft.NN
MESAVERDE4708 ft.NN
CAMEO7197 ft.NN
ROLLINS8161 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2008                 Interval Top: 6049 ft.    Interval Bottom: 8054 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/17/2008Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/12/2008
Treatment Summary:3000 GALS 7.5% HCL; 867,700# 20/40 SAND; 21,183 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7750 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1988
MCF_GAS 1053
TUBING_PRESS 1756
Perforation Data:
Interval Top:6049 ft.# Of Holes:124
Interval Bottom:8054 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)11056
GOR691000
GOR DeterminationMCFE
Average BOE per Day5.264
Average MCFE per Day30.560

 Federal Financial Assurance  i 

 Tribal Well  i No