Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14456
Well Classification: GW Status: PR - 11/28/2008
Well Name/No:DIAMOND ELK #PA 14-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CA COC5363
Facility Status:PRStatus Date11/28/2008
FacilityID:291583LocationID:335008
County:GARFIELD #045Location:NWSW 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6023 ft.
Basin:PICEANCE BASIN  
Planned Location:2152FSL  615 FWLLat/Long: 39.465604 / -107.954202Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465601 / -107.954197Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2008             Measured TD: 8041 ft.    Vertical TD: 7899 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2008
Wellbore PermitDIRECTIONAL
Permit #:20082701 Expiration Date:7/1/2009
Proposed Top PZ Location:Sec: Twp: Footage: 970 FSL  713 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 970 FSL  713 FWL
Proposed Depth/Form:8065 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:9/7/2008
Spud Date:8/26/2008Spud Date Is:ACTUAL
Measured TD:8041 ft.Measured PB depth:7991 ft.
True Vertical TD:7899 ft.True Vertical PB depth:7849 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 976 FSL  736 FWL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 976 FSL  736 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2478 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 545, Top: 0 ft., Bottom: 2478 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8019 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 3530 ft., Bottom: 8019 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2280 ft.NN
MESAVERDE4553 ft.NN
CAMEO6951 ft.NN
ROLLINS7879 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/28/2008                Interval Top: 5836 ft.    Interval Bottom: 7799 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/5/2008Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/28/2008
Treatment Summary:2991 GALS 7 1/2% HCL; 963300 30/50 SAND; 25625 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7201 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/28/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1166
CASING_PRESS 1093
MCF_GAS 923
TUBING_PRESS 944
Perforation Data:
Interval Top:5836 ft.# Of Holes:133
Interval Bottom:7799 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)10510
GOR700666
GOR DeterminationMCFE
Average BOE per Day5.007
Average MCFE per Day29.051

 Federal Financial Assurance  i 

 Tribal Well  i No