Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14417
Well Classification: GW Status: PR - 5/1/2025
Well Name/No:N PARACHUTE #WF05D-23 F23596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC44963
Facility Status:PRStatus Date5/1/2025
FacilityID:291518LocationID:335667
County:GARFIELD #045Location:SENW 23 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6155 ft.
Basin:PICEANCE BASIN  
Planned Location:2251FNL  1591 FWLLat/Long: 39.601690 / -108.140410Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.601697 / -108.140412Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2025             Measured TD: 8885 ft.    Vertical TD: 8796 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20082282 Expiration Date:5/21/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2507 FNL  699 FWL
Bottom Hole Location:Sec:23 Twp: 5S 96W Footage: 2507 FNL  699 FWL
Proposed Depth/Form:8922 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/22/2008
Spud Date:5/10/2008Spud Date Is:ACTUAL
Measured TD:8885 ft.Measured PB depth:8830 ft.
True Vertical TD:8796 ft.True Vertical PB depth:8740 ft.
Top PZ Location:Sec:23 Twp: 5S 96WFootage: 2499 FNL  699 FWL
Bottom Hole Location:Sec:23 Twp: 5S 96WFootage: 2499 FNL  699 FWL
Log Types:CBL; IND/DEN/NEU, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2538 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 2538 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8875 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 844, Top: 4596 ft., Bottom: 8875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION3764 ft.NN
MESAVERDE5315 ft.NN
CAMEO8103 ft.NN
ROLLINS8747 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/1/2025                  Interval Top: 5949 ft.    Interval Bottom: 8448 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/29/2008Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/29/2008
Treatment Summary:4206 GALS 7.5% HCL; 1,444,600# 30/50 SAND; 38221 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7871 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1067
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 986
GRAVITY_OIL 53
MCF_GAS 693
TUBING_PRESS 660
Perforation Data:
Interval Top:5949 ft.# Of Holes:170
Interval Bottom:8448 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)10626
GOR966000
GOR DeterminationMCFE
Average BOE per Day5.004
Average MCFE per Day29.011

 Federal Financial Assurance  i Y

 Tribal Well  i No