|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2025 Measured TD: 8725 ft. Vertical TD: 8710 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/15/2012 | | Proposed Top PZ Location: | Sec:7 Twp: 7S 96W | Footage: 237 FSL 1950 FEL | | Bottom Hole Location: | Sec:7 Twp: 7S 96W | Footage: 193 FSL 1972 FEL | | Proposed Depth/Form: | 8725 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-11 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: , Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1480, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 8725 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 3725 ft., Bottom: 8725 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/24/2011 | | Spud Date: | 8/14/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8725 ft. | Measured PB depth: | 8556 ft. | | True Vertical TD: | 8710 ft. | True Vertical PB depth: | 8514 ft. | | Top PZ Location: | Sec:7 Twp: 7S 96W | Footage: 237 FSL 1950 FEL | | Bottom Hole Location: | Sec:7 Twp: 7S 96W | Footage: 193 FSL 1972 FEL | | Log Types: | PNDL/GR, CBL/GR, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2397 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1936, Top: 0 ft., Bottom: 2397 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8689 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 5580 ft., Bottom: 8689 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4109 ft. | | | | | FORT UNION | 4561 ft. | | | | | WILLIAMS FORK | 5623 ft. | | | | | CAMEO | 8051 ft. | | | | | ROLLINS | 8509 ft. | | | |
Formation WFCM Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 7582 ft. Interval Bottom: 8282 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/22/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/11/2011 | | Treatment Summary: | Frac'd using 16188 bbls of Aquastim, 309100# 30/50 Ottawa, 331000# 30/50 Resin coated sand |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7178 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1073 | | CALC_MCF_GAS | 819 | | CASING_PRESS | 32 | | MCF_GAS | 819 |
| | Perforation Data: | | Interval Top: | 7582 ft. | # Of Holes: | 75 | | Interval Bottom: | 8282 ft. | Hole Size: | 0.3125 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.032 |
| Federal Financial Assurance | i | |
|
|