|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/1/2019 Measured TD: 7787 ft. Vertical TD: 7743 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/1/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/3/2010 | | Proposed Top PZ Location: | Sec:7 Twp: 6S 96W | Footage: 1683 FSL 674 FWL | | Bottom Hole Location: | Sec:7 Twp: 6S 96W | Footage: 1654 FSL 656 FWL | | Proposed Depth/Form: | 7915 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-11 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 100 ft., Weight: 84 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 2800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 900, Top: 0 ft., Bottom: 2800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7815 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 730, Top: 4032 ft., Bottom: 7815 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/7/2010 | | Spud Date: | 2/22/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7787 ft. | Measured PB depth: | 7680 ft. | | True Vertical TD: | 7743 ft. | True Vertical PB depth: | 7636 ft. | | Top PZ Location: | Sec:7 Twp: 6S 96W | Footage: 1688 FSL 669 FWL | | Bottom Hole Location: | Sec:7 Twp: 6S 96W | Footage: 1671 FSL 649 FWL | | Log Types: | PNDL/GR, PND-S CASED HOLE TRIPLE COMPBO, CLB/GR | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 3009 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1012, Top: 0 ft., Bottom: 3009 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7768 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 535, Top: 3150 ft., Bottom: 7768 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2768 ft. | | | | | FORT UNION | 3097 ft. | | | | | WILLIAMS FORK | 4554 ft. | | | | | CAMEO | 7055 ft. | | | | | ROLLINS | 7569 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 3/1/2019 Interval Top: 5880 ft. Interval Bottom: 7474 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/29/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/1/2010 | | Treatment Summary: | FRAC'D USING 15728 BBLS OF SLICKWATER GEL AND 565473 LBS OF 30/50 MESH WHITE SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7309 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/1/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 49 | | BBLS_OIL | 2 | | BTU_GAS | 1077 | | CALC_BBLS_H2O | 49 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 656000 | | CALC_MCF_GAS | 1312 | | CASING_PRESS | 604 | | GRAVITY_OIL | 49 | | MCF_GAS | 1312 | | TUBING_PRESS | 374 |
| | Perforation Data: | | Interval Top: | 5880 ft. | # Of Holes: | 141 | | Interval Bottom: | 7474 ft. | Hole Size: | 0.31 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 43 |
| Total Gas Produced (MCF) | 22580 |
| GOR | 525116 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.755 |
| Average MCFE per Day | 62.365 |
| Federal Financial Assurance | i | |
|
|