Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14267
Well Classification: GW Status: PR - 6/13/2007
Well Name/No:DIAMOND ELK #PA 332-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/13/2007
FacilityID:291029LocationID:334706
County:GARFIELD #045Location:SWNE 1 7S95W 6
Field:PARACHUTE - #67350Elevation:6108 ft.
Basin:PICEANCE BASIN  
Planned Location:1499FNL  1337 FELLat/Long: 39.469823 / -107.942485Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.469821 / -107.942488Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/8/2007             Measured TD: 8300 ft.    Vertical TD: 8268 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/8/2007
Wellbore PermitDIRECTIONAL
Permit #:20072509 Expiration Date:6/12/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1825 FNL  1821 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95W Footage: 1825 FNL  1821 FEL
Proposed Depth/Form:8377 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:2/28/2008
Spud Date:2/18/2008Spud Date Is:ACTUAL
Measured TD:8300 ft.Measured PB depth:8247 ft.
True Vertical TD:8268 ft.True Vertical PB depth:8215 ft.
Top PZ Location:Sec:1 Twp: 7S 95WFootage: 1838 FNL  1814 FEL
Bottom Hole Location:Sec:1 Twp: 7S 95WFootage: 1838 FNL  1814 FEL
Log Types:CBL, MUD, DUAL-SP-NEUTRON/SPECTRAL DENSITY/ARRAY COMP DENS
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1104 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1104 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8280 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 3525 ft., Bottom: 8280 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE4781 ft.NN
CAMEO7253 ft.NN
ROLLINS8247 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/11/2008                 Interval Top: 6093 ft.    Interval Bottom: 8164 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/25/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/2008
Treatment Summary:3512 GALS 7.5% HCL; 890,800# 20/40 SAND; 24,069 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7695 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/11/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 827
MCF_GAS 956
TUBING_PRESS 553
Perforation Data:
Interval Top:6093 ft.# Of Holes:138
Interval Bottom:8164 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)12740
GOR796250
GOR DeterminationMCFE
Average BOE per Day6.064
Average MCFE per Day35.176

 Federal Financial Assurance  i 

 Tribal Well  i No