Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14262
Well Classification: GW Status: PR - 6/13/2007
Well Name/No:WILLIAMS #GM 344-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/13/2007
FacilityID:291035LocationID:334716
County:GARFIELD #045Location:NWNE 1 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5357 ft.
Basin:PICEANCE BASIN  
Planned Location:626FNL  1433 FELLat/Long: 39.471996 / -108.054009Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471999 / -108.054006Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/30/2007             Measured TD: 7050 ft.    Vertical TD: 6822 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/30/2007
Wellbore PermitDIRECTIONAL
Permit #:20072428 Expiration Date:6/12/2008
Proposed Top PZ Location:Sec: Twp: Footage: 247 FSL  560 FEL
Bottom Hole Location:Sec:36 Twp: 6S 96W Footage: 247 FSL  560 FEL
Proposed Depth/Form:7013 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:9/21/2007
Spud Date:9/11/2007Spud Date Is:ACTUAL
Measured TD:7050 ft.Measured PB depth:7012 ft.
True Vertical TD:6822 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 6S 96WFootage: 238 FSL  587 FEL
Bottom Hole Location:Sec:36 Twp: 6S 96WFootage: 238 FSL  587 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1982 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 531, Top: 0 ft., Bottom: 1981 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7038 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 865, Top: 2550 ft., Bottom: 7037 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1771 ft.NN
WILLIAMS FORK3806 ft.NN
CAMEO6351 ft.NN
ROLLINS6930 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/31/2008                 Interval Top: 5070 ft.    Interval Bottom: 6817 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/28/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/27/2007
Treatment Summary:3009 GALS 7 1/2% HCL; 1155100# 30/50 SAND; 30790 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:6224 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1070
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1219
MCF_GAS 907
TUBING_PRESS 1093
Perforation Data:
Interval Top:5070 ft.# Of Holes:125
Interval Bottom:6817 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)20931
GOR837240
GOR DeterminationMCFE
Average BOE per Day9.950
Average MCFE per Day57.747

 Federal Financial Assurance  i Y

 Tribal Well  i No