Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14170
Well Classification: GW Status: PR - 5/18/2007
Well Name/No:FEDERAL #PA 441-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/18/2007
FacilityID:290670LocationID:335182
County:GARFIELD #045Location:NWNW 33 6S95W 6
Field:PARACHUTE - #67350Elevation:5304 ft.
Basin:PICEANCE BASIN  
Planned Location:742FNL  358 FWLLat/Long: 39.486200 / -108.011310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.486205 / -108.011312Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/3/2007             Measured TD: 7205 ft.    Vertical TD: 7147 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/3/2007
Wellbore PermitDIRECTIONAL
Permit #:20071812 Expiration Date:5/17/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1244 FNL  163 FEL
Bottom Hole Location:Sec:32 Twp: 6S 95W Footage: 1244 FNL  163 FEL
Proposed Depth/Form:7179 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:8/7/2007
Spud Date:7/27/2007Spud Date Is:ACTUAL
Measured TD:7205 ft.Measured PB depth:7147 ft.
True Vertical TD:7147 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 1225 FNL  147 FEL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 1225 FNL  147 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1712 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 467, Top: 0 ft., Bottom: 1712 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7172 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1027, Top: 3100 ft., Bottom: 7172 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1523 ft.NN
MESAVERDE3653 ft.NN
CAMEO6313 ft.NN
ROLLINS7004 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/27/2007                 Interval Top: 4837 ft.    Interval Bottom: 6918 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/11/2007Choke Size:0.750 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/10/2007
Treatment Summary:3500 GALS 7 1/2% HCL; 729,000# 30/50 SAND; 18,525 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:6501 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1812
MCF_GAS 486
TUBING_PRESS 1500
Perforation Data:
Interval Top:4837 ft.# Of Holes:132
Interval Bottom:6918 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)18986
GOR730230
GOR DeterminationMCFE
Average BOE per Day9.037
Average MCFE per Day52.445

 Federal Financial Assurance  i Y

 Tribal Well  i No