Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14133
Well Classification: GW Status: PR - 9/1/2021
Well Name/No:WILLIAMS #GM 44-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62163
Facility Status:PRStatus Date9/1/2021
FacilityID:290535LocationID:335010
County:GARFIELD #045Location:SWSE 36 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5439 ft.
Basin:PICEANCE BASIN  
Planned Location:855FSL  2393 FELLat/Long: 39.475740 / -108.057191Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475741 / -108.057191Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2021             Measured TD: 7265 ft.    Vertical TD: 6937 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20071622 Expiration Date:5/9/2008
Proposed Top PZ Location:Sec: Twp: Footage: 645 FSL  645 FEL
Bottom Hole Location:Sec:36 Twp: 6S 96W Footage: 645 FSL  645 FEL
Proposed Depth/Form:7243 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 126, Drill Unit: SE/4

Wellbore Completed
Completion Date:8/21/2007
Spud Date:8/12/2007Spud Date Is:ACTUAL
Measured TD:7265 ft.Measured PB depth:7241 ft.
True Vertical TD:6937 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 6S 96WFootage: 850 FSL  707 FEL
Bottom Hole Location:Sec:36 Twp: 6S 96WFootage: 850 FSL  707 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1170 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1170 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7247 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 2480 ft., Bottom: 7247 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1897 ft.NN
WILLIAMS FORK3999 ft.NN
CAMEO6586 ft.NN
ROLLINS7158 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2021                  Interval Top: 5553 ft.    Interval Bottom: 6994 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/2/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/20/2007
Treatment Summary:3181 GAL 7 1/2% HCL; 916700# 30/50 SAND; 24921 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6332 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/12/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1059
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 932
CASING_PRESS 758
MCF_GAS 932
TUBING_PRESS 599
Perforation Data:
Interval Top:5553 ft.# Of Holes:112
Interval Bottom:6994 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)17536
GOR762434
GOR DeterminationMCFE
Average BOE per Day8.351
Average MCFE per Day48.435

 Federal Financial Assurance  i Y

 Tribal Well  i No