Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14124
Well Classification: GW Status: PR - 11/1/2020
Well Name/No:GARDNER #21-13(PC28)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2020
FacilityID:290493LocationID:311692
County:GARFIELD #045Location:Lot 3 28 7S95W 6
Field:PARACHUTE - #67350Elevation:6424 ft.
Basin:PICEANCE BASIN  
Planned Location:83FNL  2338 FWLLat/Long: 39.415516 / -108.002931Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.415560 / -108.003350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/1/2020             Measured TD: 7463 ft.    Vertical TD: 7133 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20071788 Expiration Date:5/7/2008
Proposed Top PZ Location:Sec: Twp: Footage: 460 FSL  660 FWL
Bottom Hole Location:Sec:21 Twp: 7S 95W Footage: 460 FSL  660 FWL
Proposed Depth/Form:7546 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-48 , Unit Acreage: 640, Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-48 , Unit Acreage: 640, Drill Unit:

Wellbore Completed
Completion Date:7/2/2007
Spud Date:6/20/2007Spud Date Is:ACTUAL
Measured TD:7463 ft.Measured PB depth:7338 ft.
True Vertical TD:7133 ft.True Vertical PB depth:
Top PZ Location:Sec:21 Twp: 7S 95WFootage: 456 FSL  810 FWL
Bottom Hole Location:Sec:21 Twp: 7S 95WFootage: 456 FSL  810 FWL
Log Types:PEX-AIT; RST/GR; CBL/GR/TEMP
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 821 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 830 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7461 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 4850 ft., Bottom: 7463 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 3RD, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4733 ft.NN
WILLIAMS FORK4734 ft.7463 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 11/1/2020                 Interval Top: 5533 ft.    Interval Bottom: 7249 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/7/2007Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/7/2013Treatment End Date:1/7/2013
Treatment Summary:CIBP @ 5459' DRILLED OUT ON 1-7-13 REMOVING THE WELL FROM TEMPORARY ABANDON STATUS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/9/2012
Treatment Summary:CBP SET AT 5459', TESTED TO 1500 PSI
Formation Treatment
Treatment Date:7/26/2007
Treatment Summary:STAGES 01-05 TREATED WITH A TOTAL OF 18,998 BBLS OF SLICKWATER AND 689,039 LBS 20-40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 156
BTU_GAS 1170
CALC_BBLS_H2O 156
CALC_MCF_GAS 780
CASING_PRESS 1950
MCF_GAS 780
TUBING_PRESS 1125
Perforation Data:
Interval Top:5533 ft.# Of Holes:102
Interval Bottom:7249 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)17517
GOR729875
GOR DeterminationMCFE
Average BOE per Day8.548
Average MCFE per Day49.575

 Federal Financial Assurance  i Y

 Tribal Well  i No