Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14043
Well Classification: GW Status: PR - 10/1/2024
Well Name/No:AP #23-9-695
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:290188LocationID:335753
County:GARFIELD #045Location:SENW 9 6S95W 6
Field:PARACHUTE - #67350Elevation:8427 ft.
Basin:PICEANCE BASIN  
Planned Location:1955FNL  1677 FWLLat/Long: 39.541210 / -108.007100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.541213 / -108.007110Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2024             Measured TD: 11725 ft.    Vertical TD: 11662 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20071320 Expiration Date:4/12/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2357 FSL  2007 FWL
Bottom Hole Location:Sec:9 Twp: 6S 95W Footage: 2357 FSL  2007 FWL
Proposed Depth/Form:11812 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-40 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/12/2007
Spud Date:6/5/2007Spud Date Is:ACTUAL
Measured TD:11725 ft.Measured PB depth:11589 ft.
True Vertical TD:11662 ft.True Vertical PB depth:
Top PZ Location:Sec:9 Twp: 6S 95WFootage: 2308 FSL  1972 FWL
Bottom Hole Location:Sec:9 Twp: 6S 95WFootage: 2308 FSL  1972 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3095 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 0 ft., Bottom: 3095 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11725 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 7630 ft., Bottom: 11725 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2750 ft.NN
FORT UNION6180 ft.NN
WILLIAMS FORK7877 ft.NN
CAMEO10839 ft.NN
ROLLINS11484 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/1/2024                 Interval Top: 9220 ft.    Interval Bottom: 11397 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/23/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/6/2007
Treatment Summary:6436 GALS 7.5% HCL; 756500# 20/40 SAND; 31698 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:11330 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/14/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1060
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 842
MCF_GAS 751
TUBING_PRESS 322
Perforation Data:
Interval Top:9220 ft.# Of Holes:157
Interval Bottom:11397 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7012
GOR637454
GOR DeterminationMCFE
Average BOE per Day3.345
Average MCFE per Day19.407

 Federal Financial Assurance  i 

 Tribal Well  i No