Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14040
Well Classification: GW Status: PR - 10/1/2024
Well Name/No:AP #333-9-695
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:290191LocationID:335626
County:GARFIELD #045Location:NWSE 9 6S95W 6
Field:PARACHUTE - #67350Elevation:8633 ft.
Basin:PICEANCE BASIN  
Planned Location:1756FSL  1698 FELLat/Long: 39.536890 / -108.000460Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.536895 / -108.000480Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2024             Measured TD: 11830 ft.    Vertical TD: 11802 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20071322 Expiration Date:4/12/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2415 FSL  1919 FEL
Bottom Hole Location:Sec:9 Twp: 6S 95W Footage: 2415 FSL  1919 FEL
Proposed Depth/Form:11890 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-40 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/1/2007
Spud Date:6/14/2007Spud Date Is:ACTUAL
Measured TD:11830 ft.Measured PB depth:11788 ft.
True Vertical TD:11802 ft.True Vertical PB depth:
Top PZ Location:Sec:9 Twp: 6S 95WFootage: 2405 FSL  1909 FEL
Bottom Hole Location:Sec:9 Twp: 6S 95WFootage: 2405 FSL  1909 FEL
Log Types:CBL; RESEVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3041 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 0 ft., Bottom: 3041 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11813 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 829, Top: 7580 ft., Bottom: 11813 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND5776 ft.NN
FORT UNION6240 ft.NN
WILLIAMS FORK8100 ft.NN
CAMEO11041 ft.NN
ROLLINS11709 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/1/2024                 Interval Top: 9460 ft.    Interval Bottom: 11659 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/29/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2007
Treatment Summary:8225 GALS 10% HCL; 818944# 20/40 SAND; 25182 SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:11505 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1045
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 299
MCF_GAS 655
TUBING_PRESS 281
Perforation Data:
Interval Top:9460 ft.# Of Holes:187
Interval Bottom:11659 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)45
Total Gas Produced (MCF)15978
GOR355066
GOR DeterminationMCFE
Average BOE per Day7.673
Average MCFE per Day44.537

 Federal Financial Assurance  i 

 Tribal Well  i No