Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14014
Well Classification: GW Status: PR - 1/23/2008
Well Name/No:CLOUGH #RWF 542-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/23/2008
FacilityID:290107LocationID:335688
County:GARFIELD #045Location:SENE 14 6S94W 6
Field:RULISON - #75400Elevation:5385 ft.
Basin:PICEANCE BASIN  
Planned Location:1773FNL  686 FELLat/Long: 39.527676 / -107.848941Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.527674 / -107.848950Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/23/2008             Measured TD: 8390 ft.    Vertical TD: 8370 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/23/2008
Wellbore PermitDIRECTIONAL
Permit #:20080512 Expiration Date:3/23/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1373 FNL  686 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94W Footage: 1373 FNL  686 FEL
Proposed Depth/Form:8310 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:3/13/2008
Spud Date:2/29/2008Spud Date Is:ACTUAL
Measured TD:8390 ft.Measured PB depth:8222 ft.
True Vertical TD:8370 ft.True Vertical PB depth:8202 ft.
Top PZ Location:Sec:14 Twp: 6S 94WFootage: 1374 FNL  687 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94WFootage: 1374 FNL  687 FEL
Log Types:CBL, HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1132 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8331 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1308, Top: 3540 ft., Bottom: 8331 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1976 ft.NN
MESAVERDE4517 ft.NN
CAMEO7404 ft.NN
ROLLINS8290 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/1/2008                 Interval Top: 6356 ft.    Interval Bottom: 8067 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/8/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/6/2008
Treatment Summary:3503 GALS 7 1/2% HCL; 725400 # WHITE 20 SAND; 20538 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7669 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 509
MCF_GAS 549
TUBING_PRESS 318
Perforation Data:
Interval Top:6356 ft.# Of Holes:116
Interval Bottom:8067 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)10383
GOR273236
GOR DeterminationMCFE
Average BOE per Day5.012
Average MCFE per Day29.071

 Federal Financial Assurance  i 

 Tribal Well  i No