Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14008
Well Classification: GW Status: PR - 4/12/2007
Well Name/No:CLOUGH #RWF 531-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/12/2007
FacilityID:290113LocationID:335688
County:GARFIELD #045Location:SENE 14 6S94W 6
Field:RULISON - #75400Elevation:5386 ft.
Basin:PICEANCE BASIN  
Planned Location:1744FNL  699 FELLat/Long: 39.527755 / -107.848988Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.527754 / -107.848995Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/5/2007             Measured TD: 8770 ft.    Vertical TD: 8407 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/5/2007
Wellbore PermitDIRECTIONAL
Permit #:20071247 Expiration Date:4/10/2008
Proposed Top PZ Location:Sec: Twp: Footage: 289 FNL  1968 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94W Footage: 289 FNL  1968 FEL
Proposed Depth/Form:8667 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:12/24/2007
Spud Date:12/3/2007Spud Date Is:ACTUAL
Measured TD:8770 ft.Measured PB depth:8656 ft.
True Vertical TD:8407 ft.True Vertical PB depth:8293 ft.
Top PZ Location:Sec:14 Twp: 6S 94WFootage: 275 FNL  1987 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94WFootage: 275 FNL  1987 FEL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2334 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 514, Top: 0 ft., Bottom: 2334 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8746 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1446, Top: 2400 ft., Bottom: 8746 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2007 ft.NN
MESAVERDE4824 ft.NN
CAMEO7706 ft.NN
ROLLINS8674 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/10/2008                 Interval Top: 6733 ft.    Interval Bottom: 8500 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/4/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2008
Treatment Summary:2,512 GALS 7.5% HCL; 548,913# 20/40 SAND; 16,023 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8092 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/10/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1136
CASING_PRESS 792
MCF_GAS 313
TUBING_PRESS 670
Perforation Data:
Interval Top:6733 ft.# Of Holes:94
Interval Bottom:8500 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)14707
GOR267400
GOR DeterminationMCFE
Average BOE per Day7.094
Average MCFE per Day41.171

 Federal Financial Assurance  i 

 Tribal Well  i No