Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14006
Well Classification: GW Status: PR - 7/31/2008
Well Name/No:CLOUGH #RWF 341-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/31/2008
FacilityID:290115LocationID:335688
County:GARFIELD #045Location:SENE 14 6S94W 6
Field:RULISON - #75400Elevation:5386 ft.
Basin:PICEANCE BASIN  
Planned Location:1765FNL  687 FELLat/Long: 39.527696 / -107.848944Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.527695 / -107.848954Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2008             Measured TD: 8430 ft.    Vertical TD: 8379 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20080516 Expiration Date:3/23/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1051 FNL  736 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94W Footage: 1051 FNL  736 FEL
Proposed Depth/Form:8361 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:4/8/2008
Spud Date:3/28/2008Spud Date Is:ACTUAL
Measured TD:8430 ft.Measured PB depth:8234 ft.
True Vertical TD:8379 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 6S 94WFootage: 1056 FNL  737 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94WFootage: 1056 FNL  737 FEL
Log Types:CBL, RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1160 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1160 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8410 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1320, Top: 4110 ft., Bottom: 8410 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1967 ft.NN
MESAVERDE4547 ft.NN
CAMEO7449 ft.NN
ROLLINS8331 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2008                 Interval Top: 6434 ft.    Interval Bottom: 8067 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/6/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/31/2008
Treatment Summary:4003 GALS 7.5% HCL; 637,600# 20/40 SAND; 18,368 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7713 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1123
CALC_BBLS_H2O 0
CALC_GOR 0
CALC_MCF_GAS 533
CASING_PRESS 572
MCF_GAS 533
TUBING_PRESS 341
Perforation Data:
Interval Top:6434 ft.# Of Holes:104
Interval Bottom:8067 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)6793
GOR251592
GOR DeterminationMCFE
Average BOE per Day3.280
Average MCFE per Day19.048

 Federal Financial Assurance  i 

 Tribal Well  i No