Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14006
Well Classification: GW Status: PR - 7/31/2008
Well Name/No:CLOUGH #RWF 341-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/31/2008
FacilityID:290115LocationID:335688
County:GARFIELD #045Location:SENE 14 6S94W 6
Field:RULISON - #75400Elevation:5386 ft.
Basin:PICEANCE BASIN  
Planned Location:1765FNL  687 FELLat/Long: 39.527696 / -107.848944Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.527695 / -107.848954Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2008             Measured TD: 8430 ft.    Vertical TD: 8379 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20080516 Expiration Date:3/23/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1051 FNL  736 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94W Footage: 1051 FNL  736 FEL
Proposed Depth/Form:8361 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:4/8/2008
Spud Date:3/28/2008Spud Date Is:ACTUAL
Measured TD:8430 ft.Measured PB depth:8234 ft.
True Vertical TD:8379 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 6S 94WFootage: 1056 FNL  737 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94WFootage: 1056 FNL  737 FEL
Log Types:CBL, RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1160 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1160 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8410 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1320, Top: 4110 ft., Bottom: 8410 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1967 ft.NN
MESAVERDE4547 ft.NN
CAMEO7449 ft.NN
ROLLINS8331 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2008                 Interval Top: 6434 ft.    Interval Bottom: 8067 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/6/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/31/2008
Treatment Summary:4003 GALS 7.5% HCL; 637,600# 20/40 SAND; 18,368 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7713 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1123
CALC_BBLS_H2O 0
CALC_GOR 0
CALC_MCF_GAS 533
CASING_PRESS 572
MCF_GAS 533
TUBING_PRESS 341
Perforation Data:
Interval Top:6434 ft.# Of Holes:104
Interval Bottom:8067 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)6605
GOR235892
GOR DeterminationMCFE
Average BOE per Day3.193
Average MCFE per Day18.535

 Federal Financial Assurance  i 

 Tribal Well  i No