Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-14002
Well Classification: GW Status: PR - 11/30/2008
Well Name/No:CLOUGH #RWF 12-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC34798
Facility Status:PRStatus Date11/30/2008
FacilityID:290119LocationID:335688
County:GARFIELD #045Location:SENE 14 6S94W 6
Field:RULISON - #75400Elevation:5385 ft.
Basin:PICEANCE BASIN  
Planned Location:1795FNL  685 FELLat/Long: 39.527614 / -107.848933Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.527613 / -107.848941Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/30/2008             Measured TD: 8559 ft.    Vertical TD: 8360 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20080509 Expiration Date:3/23/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1808 FNL  747 FWL
Bottom Hole Location:Sec:13 Twp: 6S 94W Footage: 1808 FNL  747 FWL
Proposed Depth/Form:8637 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-14 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:6/13/2008
Spud Date:5/31/2008Spud Date Is:ACTUAL
Measured TD:8559 ft.Measured PB depth:8381 ft.
True Vertical TD:8360 ft.True Vertical PB depth:
Top PZ Location:Sec:13 Twp: 6S 94WFootage: 1821 FNL  757 FWL
Bottom Hole Location:Sec:13 Twp: 6S 94WFootage: 1821 FNL  757 FWL
Log Types:CBL; RMTE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2333 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 2333 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8558 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1323, Top: 3046 ft., Bottom: 8558 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2006 ft.NN
MESAVERDE4655 ft.NN
CAMEO7576 ft.NN
ROLLINS8493 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/30/2008                Interval Top: 6296 ft.    Interval Bottom: 9232 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/24/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/22/2008
Treatment Summary:3000 GALS 7.5% HCL; 691,200# 20/40 SAND; 19,447 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7742 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_OIL 0
CALC_MCF_GAS 616
CASING_PRESS 628
MCF_GAS 616
TUBING_PRESS 428
Perforation Data:
Interval Top:6296 ft.# Of Holes:109
Interval Bottom:9232 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)37
Total Gas Produced (MCF)10533
GOR284675
GOR DeterminationMCFE
Average BOE per Day5.079
Average MCFE per Day29.440

 Federal Financial Assurance  i 

 Tribal Well  i No