Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13998
Well Classification: GW Status: PR - 12/1/2009
Well Name/No:CLOUGH #RWF 432-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2009
FacilityID:290123LocationID:335688
County:GARFIELD #045Location:SENE 14 6S94W 6
Field:RULISON - #75400Elevation:5385 ft.
Basin:PICEANCE BASIN  
Planned Location:1804FNL  694 FELLat/Long: 39.527591 / -107.848965Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.527589 / -107.848973Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2009             Measured TD: 8490 ft.    Vertical TD: 8312 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2009
Wellbore PermitDIRECTIONAL
Permit #:20080518 Expiration Date:3/23/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2290 FNL  1989 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94W Footage: 2290 FNL  1989 FEL
Proposed Depth/Form:8390 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:7/12/2008
Spud Date:6/29/2008Spud Date Is:ACTUAL
Measured TD:8490 ft.Measured PB depth:8377 ft.
True Vertical TD:8312 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 6S 94WFootage: 2268 FNL  1953 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94WFootage: 2268 FNL  1953 FEL
Log Types:CBL, HIGH RES.IND.,SPECTRAL DENS.,DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2260 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 2260 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8565 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1325, Top: 3721 ft., Bottom: 8565 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1975 ft.NN
MESAVERDE4587 ft.NN
CAMEO7491 ft.NN
ROLLINS8456 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2009                 Interval Top: 6186 ft.    Interval Bottom: 8219 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/3/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/22/2008
Treatment Summary:3500 GALS 7.5% HCL; 762,000# 20/40 SAND; 21751 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7738 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_OIL 0
CALC_MCF_GAS 917
CASING_PRESS 828
MCF_GAS 917
TUBING_PRESS 525
Perforation Data:
Interval Top:6186 ft.# Of Holes:135
Interval Bottom:8219 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)8628
GOR269625
GOR DeterminationMCFE
Average BOE per Day4.158
Average MCFE per Day24.109

 Federal Financial Assurance  i 

 Tribal Well  i No