Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13979
Well Classification: DSPW Status: IJ - 9/1/2025
Well Name/No:WILLIAMS #GM 523-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date9/1/2025
FacilityID:290103LocationID:334947
County:GARFIELD #045Location:SESW 36 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5448 ft.
Basin:PICEANCE BASIN  
Planned Location:1125FSL  1630 FWLLat/Long: 39.476390 / -108.060910Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476389 / -108.060918Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: IJ - 9/1/2025             Measured TD: 6840 ft.    Vertical TD: 6831 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        IJ - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20090963 Expiration Date:4/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1350 FSL  1684 FWL
Bottom Hole Location:Sec:36 Twp: 6S 96W Footage: 1350 FSL  1684 FWL
Proposed Depth/Form:6840 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-13 , Unit Acreage: 160, Drill Unit: SW4
Casing:String Type: CONDUCTOR, Hole Size: 18 in., Size: 24 in., Top: , Depth: 45 ft., Weight: 18 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 45 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1112 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 0 ft., Bottom: 1112 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6828 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 845, Top: 2200 ft., Bottom: 6828 ft.

Wellbore Completed
Completion Date:5/21/2007
Spud Date:5/12/2007Spud Date Is:ACTUAL
Measured TD:6840 ft.Measured PB depth:6803 ft.
True Vertical TD:6831 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1350 FSL  1684 FWL
Bottom Hole Location:Sec:36 Twp: 6S 96WFootage: 1350 FSL  1684 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/ DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1112 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1112 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6828 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 2325 ft., Bottom: 6828 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1813 ft.NN
FORT UNION2070 ft.NN
MESAVERDE3693 ft.NN
CAMEO6243 ft.NN
ROLLINS6733 ft.NN

Formation WFCM                     Formation Classification:  DSPW                     Status:  IJ - 9/1/2025                  Interval Top: 4942 ft.    Interval Bottom: 6649 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/14/2007Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/9/2007
Treatment Summary:3636 GAL 7 1/2% HCL; 1044100# 30/50 SAND; 37670 BBL SLICKWATER (SUMMARY)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1351
MCF_GAS 607
TUBING_PRESS 1017
Perforation Data:
Interval Top:4942 ft.# Of Holes:141
Interval Bottom:6649 ft.Hole Size:0.35 in.

Formation MVRD                     Formation Classification:  DSPW                     Status:  IJ - 9/1/2025                  Interval Top: 3700 ft.    Interval Bottom: 4706 ft.

 Completed Information for Formation MESAVERDE
1st Production Date:5/8/2009Choke Size: 
Formation Name:MESAVERDECommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/17/2009
Treatment Summary:INJUECTION ZONE PRESSURE TEST 4/22/09 2144 PSI 3747 GALS 7 1/2% HCL; 909564# 20/40 SAND; 34466 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.875 in.Tubing Setting Depth:3689 ft.
Tubing Packer Depth:3689 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MVRD.
Perforation Data:
Interval Top:3700 ft.# Of Holes:84
Interval Bottom:4706 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No