Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13967
Well Classification: GW Status: PR - 9/1/2020
Well Name/No:N PARACHUTE #EF12A-19 L19595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 44963
Facility Status:PRStatus Date9/1/2020
FacilityID:290079LocationID:335635
County:GARFIELD #045Location:Lot 9 19 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6023 ft.
Basin:PICEANCE BASIN  
Planned Location:2309FSL  587 FWLLat/Long: 39.598390 / -108.106510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.598397 / -108.106508Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2020             Measured TD: 9463 ft.    Vertical TD: 9455 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20071117 Expiration Date:4/9/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2061 FSL  909 FWL
Bottom Hole Location:Sec:19 Twp: 5S 95W Footage: 2061 FSL  909 FWL
Proposed Depth/Form:9449 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/6/2007
Spud Date:7/19/2007Spud Date Is:ACTUAL
Measured TD:9463 ft.Measured PB depth:9384 ft.
True Vertical TD:9455 ft.True Vertical PB depth:9376 ft.
Top PZ Location:Sec:19 Twp: 5S 95WFootage: 2453 FSL  366 FWL
Bottom Hole Location:Sec:19 Twp: 5S 95WFootage: 2453 FSL  366 FWL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2543 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 667, Top: 0 ft., Bottom: 2543 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9443 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 917, Top: 5370 ft., Bottom: 9443 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION4005 ft.NN
MESAVERDE5554 ft.NN
CAMEO8601 ft.NN
ROLLINS9270 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2020                  Interval Top: 5595 ft.    Interval Bottom: 9100 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/16/2007Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/14/2007
Treatment Summary:5,988 GALS 7.5% HCL; 1,815,300# 30/50 SAND; 49,773 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8354 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1070
CASING_PRESS 850
MCF_GAS 1369
TUBING_PRESS 302
Perforation Data:
Interval Top:5595 ft.# Of Holes:224
Interval Bottom:9100 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)11453
GOR11453000
GOR DeterminationMCFE
Average BOE per Day5.411
Average MCFE per Day31.364

 Federal Financial Assurance  i Y

 Tribal Well  i No