Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13951
Well Classification: GW Status: PR - 4/3/2007
Well Name/No:FEDERAL #RWF 431-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date4/3/2007
FacilityID:289976LocationID:335659
County:GARFIELD #045Location:SENE 10 6S94W 6
Field:RULISON - #75400Elevation:5807 ft.
Basin:PICEANCE BASIN  
Planned Location:2382FNL  830 FELLat/Long: 39.541006 / -107.867738Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.541005 / -107.867733Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/26/2007             Measured TD: 9375 ft.    Vertical TD: 8936 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/26/2007
Wellbore PermitDIRECTIONAL
Permit #:20070961 Expiration Date:4/2/2008
Proposed Top PZ Location:Sec: Twp: Footage: 481 FNL  1953 FEL
Bottom Hole Location:Sec:10 Twp: 6S 94W Footage: 481 FNL  1953 FEL
Proposed Depth/Form:9330 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/15/2007
Spud Date:9/22/2007Spud Date Is:ACTUAL
Measured TD:9375 ft.Measured PB depth:9315 ft.
True Vertical TD:8936 ft.True Vertical PB depth:
Top PZ Location:Sec:10 Twp: 6S 94WFootage: 462 FNL  1960 FEL
Bottom Hole Location:Sec:10 Twp: 6S 94WFootage: 462 FNL  1960 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2856 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 2856 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9350 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1335, Top: 4200 ft., Bottom: 9350 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2525 ft.NN
WILLIAMS FORK5455 ft.NN
CAMEO8310 ft.NN
ROLLINS9278 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/7/2008                  Interval Top: 7007 ft.    Interval Bottom: 9080 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/18/2007Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/13/2007
Treatment Summary:3,500 GAL 7 1/2% HCL; 664,300# 20/40 SAND; 18,366 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8527 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1142
CASING_PRESS 1134
MCF_GAS 1020
TUBING_PRESS 862
Perforation Data:
Interval Top:7007 ft.# Of Holes:113
Interval Bottom:9080 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)48
Total Gas Produced (MCF)15262
GOR317958
GOR DeterminationMCFE
Average BOE per Day7.340
Average MCFE per Day42.572

 Federal Financial Assurance  i Y

 Tribal Well  i No