Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13938
Well Classification: GW Status: PR - 2/15/2008
Well Name/No:FEDERAL #RWF 31-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date2/15/2008
FacilityID:289990LocationID:335659
County:GARFIELD #045Location:SENE 10 6S94W 6
Field:RULISON - #75400Elevation:5807 ft.
Basin:PICEANCE BASIN  
Planned Location:2389FNL  832 FELLat/Long: 39.540987 / -107.867747Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.540986 / -107.867742Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/15/2008             Measured TD: 9081 ft.    Vertical TD: 8754 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/15/2008
Wellbore PermitDIRECTIONAL
Permit #:20070959 Expiration Date:4/2/2008
Proposed Top PZ Location:Sec: Twp: Footage: 801 FNL  1974 FEL
Bottom Hole Location:Sec:10 Twp: 6S 94W Footage: 801 FNL  1974 FEL
Proposed Depth/Form:9224 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/6/2007
Spud Date:10/16/2007Spud Date Is:ACTUAL
Measured TD:9081 ft.Measured PB depth:9043 ft.
True Vertical TD:8754 ft.True Vertical PB depth:8716 ft.
Top PZ Location:Sec:10 Twp: 6S 94WFootage: 801 FNL  1971 FEL
Bottom Hole Location:Sec:10 Twp: 6S 94WFootage: 801 FNL  1971 FEL
Log Types:CBL;RESERVOIR MONITOR TOOL ELITE; MUD LOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 84 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2824 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 251, Top: 0 ft., Bottom: 2823 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9076 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 715, Top: 5070 ft., Bottom: 9076 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2504 ft.NN
MESAVERDE5338 ft.NN
CAMEO8180 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/15/2008                 Interval Top: 6814 ft.    Interval Bottom: 8634 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/18/2007Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/13/2007
Treatment Summary:2,500 GAL 7 1/2% HCL; 618,200# 20/40 SAND; 17,091 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8167 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/15/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1151
CALC_GOR 0
CASING_PRESS 699
MCF_GAS 761
TUBING_PRESS 438
Perforation Data:
Interval Top:6814 ft.# Of Holes:104
Interval Bottom:8634 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)40
Total Gas Produced (MCF)12735
GOR318375
GOR DeterminationMCFE
Average BOE per Day6.129
Average MCFE per Day35.537

 Federal Financial Assurance  i Y

 Tribal Well  i No