Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13845
Well Classification: GW Status: PR - 12/1/2021
Well Name/No:SHORE FEDERAL #16-15 (PJ16)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 01524
Facility Status:PRStatus Date12/1/2021
FacilityID:289667LocationID:334656
County:GARFIELD #045Location:NWSE 16 7S95W 6
Field:PARACHUTE - #67350Elevation:6065 ft.
Basin:PICEANCE BASIN  
Planned Location:1535FSL  2306 FELLat/Long: 39.434471 / -108.001047Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.434770 / -108.001210Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2021             Measured TD: 7325 ft.    Vertical TD: 7151 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20070627 Expiration Date:3/7/2008
Proposed Top PZ Location:Sec:16 Twp: 7S 95W Footage: 480 FSL  1927 FEL
Bottom Hole Location:Sec:16 Twp: 7S 95W Footage: 480 FSL  1927 FEL
Proposed Depth/Form:7351 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-67 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/26/2007
Spud Date:7/14/2007Spud Date Is:ACTUAL
Measured TD:7325 ft.Measured PB depth:7241 ft.
True Vertical TD:7151 ft.True Vertical PB depth:7067 ft.
Top PZ Location:Sec:16 Twp: 7S 95WFootage: 480 FSL  1927 FEL
Bottom Hole Location:Sec:16 Twp: 7S 95WFootage: 480 FSL  1927 FEL
Log Types:RST, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 843 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 869 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7325 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 599, Top: 4100 ft., Bottom: 7325 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4622 ft.NN
WILLIAMS FORK4623 ft.7325 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/1/2021                 Interval Top: 5494 ft.    Interval Bottom: 7136 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/29/2007Choke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2007
Treatment Summary:STAGES 01-06 TREATED WITH A TOTAL OF 34,485 BBLS OF SLICKWATER, 838,092 LBS 20-40 WHITE SAND, AND 14,000 LBS NON API FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6559 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 89
BTU_GAS 1170
CALC_BBLS_H2O 89
CALC_MCF_GAS 1364
CASING_PRESS 1500
MCF_GAS 1364
TUBING_PRESS 1220
Perforation Data:
Interval Top:5494 ft.# Of Holes:116
Interval Bottom:7136 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)20883
GOR673645
GOR DeterminationMCFE
Average BOE per Day9.952
Average MCFE per Day57.701

 Federal Financial Assurance  i Y

 Tribal Well  i No