Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13840
Well Classification: GW Status: PR - 3/7/2007
Well Name/No:N. PARACHUTE #EF10D G29 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/7/2007
FacilityID:289626LocationID:335573
County:GARFIELD #045Location:SWNE 29 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6101 ft.
Planned Location:2252FNL  1504 FELLat/Long: 39.585880 / -108.073980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.585885 / -108.073994Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/7/2007             Measured TD: 9783 ft.    Vertical TD: 9479 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/7/2007
Wellbore PermitDIRECTIONAL
Permit #:20070610 Expiration Date:3/6/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1650 FSL  1650 FEL
Bottom Hole Location:Sec:29 Twp: 5S 95W Footage: 1650 FSL  1650 FEL
Proposed Depth/Form:12220 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:N.PARACHUTE Unit Number:EF 10D G29 5
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/23/2007
Spud Date:5/2/2007Spud Date Is:ACTUAL
Measured TD:9783 ft.Measured PB depth:9728 ft.
True Vertical TD:9479 ft.True Vertical PB depth:9424 ft.
Top PZ Location:Sec:29 Twp: 5S 95WFootage: 1519 FSL  2050 FEL
Bottom Hole Location:Sec:29 Twp: 5S 95WFootage: 1519 FSL  2050 FEL
Log Types:CBL, MUD
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2509 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 0 ft., Bottom: 2520 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9773 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1379, Top: 3170 ft., Bottom: 9773 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6105 ft.9657 ft.NN
ROLLINS9657 ft.9783 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/13/2008                 Interval Top: 6146 ft.    Interval Bottom: 9591 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/8/2008Choke Size:0.344 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/26/2008
Treatment Summary:STAGES 01-11 TREATED W/A TOTAL OF: 49120 BBLS SLICKWATER; 544,000# 30/50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8099 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/13/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BTU_GAS 1170
CASING_PRESS 2500
MCF_GAS 410
TUBING_PRESS 1400
Perforation Data:
Interval Top:6146 ft.# Of Holes:330
Interval Bottom:9591 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)57
Total Gas Produced (MCF)9827
GOR172403
GOR DeterminationMCFE
Average BOE per Day4.793
Average MCFE per Day27.822

 Federal Financial Assurance  i 

 Tribal Well  i No