Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13830
Well Classification: GW Status: PR - 3/7/2007
Well Name/No:HILLTOP 2F2 RANCH LLC #RMV 109-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/7/2007
FacilityID:289636LocationID:334803
County:GARFIELD #045Location:SESW 33 6S94W 6
Field:RULISON - #75400Elevation:5876 ft.
Basin:PICEANCE BASIN  
Planned Location:644FSL  2013 FWLLat/Long: 39.476200 / -107.894360Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476201 / -107.894363Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/5/2007             Measured TD: 8342 ft.    Vertical TD: 7866 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/5/2007
Wellbore PermitDIRECTIONAL
Permit #:20070584 Expiration Date:3/6/2008
Proposed Top PZ Location:Sec: Twp: Footage: 234 FNL  1293 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 234 FNL  1293 FEL
Proposed Depth/Form:8371 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:11/10/2007
Spud Date:10/26/2007Spud Date Is:ACTUAL
Measured TD:8342 ft.Measured PB depth:8270 ft.
True Vertical TD:7866 ft.True Vertical PB depth:7794 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 219 FNL  1343 FEL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 219 FNL  1343 FEL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2522 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 655, Top: 0 ft., Bottom: 2522 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8319 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 985, Top: 3800 ft., Bottom: 8319 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2300 ft.NN
MESAVERDE4880 ft.NN
CAMEO7444 ft.NN
ROLLINS8436 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/31/2008                 Interval Top: 6270 ft.    Interval Bottom: 8176 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/10/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2008
Treatment Summary:3,508 GALS 7.5% HCL; 610,950# 20/40 SAND; 17,699 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7354 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1051
CASING_PRESS 621
MCF_GAS 570
TUBING_PRESS 443
Perforation Data:
Interval Top:6270 ft.# Of Holes:126
Interval Bottom:8176 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)16992
GOR738782
GOR DeterminationMCFE
Average BOE per Day8.099
Average MCFE per Day46.983

 Federal Financial Assurance  i 

 Tribal Well  i No