Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13829
Well Classification: GW Status: PR - 11/28/2007
Well Name/No:HILLTOP 2F2 RANCH LLC #RWF 413-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/28/2007
FacilityID:289637LocationID:334891
County:GARFIELD #045Location:SWSW 33 6S94W 6
Field:RULISON - #75400Elevation:5925 ft.
Basin:PICEANCE BASIN  
Planned Location:764FSL  1036 FWLLat/Long: 39.476502 / -107.897836Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476501 / -107.897839Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2007             Measured TD: 8162 ft.    Vertical TD: 8110 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2007
Wellbore PermitDIRECTIONAL
Permit #:20076762 Expiration Date:1/9/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1376 FSL  652 FWL
Bottom Hole Location:Sec:33 Twp: 6S 94W Footage: 1376 FSL  652 FWL
Proposed Depth/Form:8093 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:2/6/2008
Spud Date:1/24/2008Spud Date Is:ACTUAL
Measured TD:8162 ft.Measured PB depth:8038 ft.
True Vertical TD:8110 ft.True Vertical PB depth:7986 ft.
Top PZ Location:Sec:33 Twp: 6S 94WFootage: 1381 FSL  622 FWL
Bottom Hole Location:Sec:33 Twp: 6S 94WFootage: 1381 FSL  622 FWL
Log Types:CBL, HRI/SD/DSN, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1126 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8141 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4560 ft., Bottom: 8141 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2214 ft.NN
MESAVERDE4612 ft.NN
CAMEO7175 ft.NN
ROLLINS8135 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/26/2008                 Interval Top: 5850 ft.    Interval Bottom: 7964 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/14/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/12/2008
Treatment Summary:4296 GALS 7 1/2% HCL; 790300# 20/40 SAND; 25634 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7116 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1036
MCF_GAS 1013
TUBING_PRESS 854
Perforation Data:
Interval Top:5850 ft.# Of Holes:172
Interval Bottom:7964 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)16787
GOR729869
GOR DeterminationMCFE
Average BOE per Day8.000
Average MCFE per Day46.382

 Federal Financial Assurance  i 

 Tribal Well  i No