Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13828
Well Classification: GW Status: PR - 11/28/2007
Well Name/No:HILLTOP 2F2 RANCH LLC #RWF 14-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/28/2007
FacilityID:289638LocationID:334891
County:GARFIELD #045Location:SWSW 33 6S94W 6
Field:RULISON - #75400Elevation:5925 ft.
Basin:PICEANCE BASIN  
Planned Location:764FSL  1029 FWLLat/Long: 39.476505 / -107.897862Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476505 / -107.897865Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2007             Measured TD: 8035 ft.    Vertical TD: 8028 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2007
Wellbore PermitDIRECTIONAL
Permit #:20076761 Expiration Date:1/9/2009
Proposed Top PZ Location:Sec: Twp: Footage: 748 FSL  783 FWL
Bottom Hole Location:Sec:33 Twp: 6S 94W Footage: 748 FSL  783 FWL
Proposed Depth/Form:8045 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:2/20/2008
Spud Date:2/8/2008Spud Date Is:ACTUAL
Measured TD:8035 ft.Measured PB depth:8028 ft.
True Vertical TD:8028 ft.True Vertical PB depth:8021 ft.
Top PZ Location:Sec:33 Twp: 6S 94WFootage: 753 FSL  777 FWL
Bottom Hole Location:Sec:33 Twp: 6S 94WFootage: 753 FSL  777 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1126 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8077 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4122 ft., Bottom: 8077 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2187 ft.NN
MESAVERDE4552 ft.NN
CAMEO7107 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/26/2008                 Interval Top: 5808 ft.    Interval Bottom: 7891 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/14/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/12/2008
Treatment Summary:3568 GALS 7 1/2% HCL; 835700# 20/40 SAND; 24489 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/26/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 854
MCF_GAS 1012
TUBING_PRESS 680
Perforation Data:
Interval Top:5808 ft.# Of Holes:145
Interval Bottom:7891 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)20256
GOR723428
GOR DeterminationMCFE
Average BOE per Day9.650
Average MCFE per Day55.995

 Federal Financial Assurance  i 

 Tribal Well  i No