Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13824
Well Classification: GW Status: PR - 3/7/2007
Well Name/No:HILLTOP 2F2 RANCH LLC #RWF 22-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/7/2007
FacilityID:289642LocationID:334780
County:GARFIELD #045Location:NESW 33 6S94W 6
Field:RULISON - #75400Elevation:5756 ft.
Basin:PICEANCE BASIN  
Planned Location:2420FSL  1631 FWLLat/Long: 39.481060 / -107.895900Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.481064 / -107.895907Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/5/2007             Measured TD: 8149 ft.    Vertical TD: 8001 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/5/2007
Wellbore PermitDIRECTIONAL
Permit #:20070578 Expiration Date:3/6/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1712 FNL  1829 FWL
Bottom Hole Location:Sec:33 Twp: 6S 94W Footage: 1712 FNL  1829 FWL
Proposed Depth/Form:8149 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:11/22/2007
Spud Date:11/8/2007Spud Date Is:ACTUAL
Measured TD:8149 ft.Measured PB depth:7860 ft.
True Vertical TD:8001 ft.True Vertical PB depth:7712 ft.
Top PZ Location:Sec:33 Twp: 6S 94WFootage: 1738 FNL  1799 FWL
Bottom Hole Location:Sec:33 Twp: 6S 94WFootage: 1738 FNL  1799 FWL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2263 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 628, Top: 0 ft., Bottom: 2263 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8188 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 3750 ft., Bottom: 8188 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2041 ft.NN
MESAVERDE4485 ft.NN
CAMEO7145 ft.NN
ROLLINS8124 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/30/2008                 Interval Top: 5835 ft.    Interval Bottom: 7786 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/30/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/28/2007
Treatment Summary:3,163 GALS 7.5% HCL; 758,0000# 20/40 SAND; 21,020 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7030 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1096
CASING_PRESS 716
MCF_GAS 679
TUBING_PRESS 501
Perforation Data:
Interval Top:5835 ft.# Of Holes:149
Interval Bottom:7786 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)11845
GOR740312
GOR DeterminationMCFE
Average BOE per Day5.636
Average MCFE per Day32.716

 Federal Financial Assurance  i 

 Tribal Well  i No