Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13804
Well Classification: GW Status: PR - 3/6/2007
Well Name/No:N. PARACHUTE #WF02D-DX A36 59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/6/2007
FacilityID:289595LocationID:335848
County:GARFIELD #045Location:NENE 36 5S96W 6
Field:GRAND VALLEY - #31290Elevation:5793 ft.
Planned Location:282FNL  524 FELLat/Long: 39.578131 / -108.110481Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.578134 / -108.110489Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/5/2007             Measured TD: 9010 ft.    Vertical TD: 8816 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/5/2007
Wellbore PermitDIRECTIONAL
Permit #:20070514 Expiration Date:3/5/2008
Proposed Top PZ Location:Sec:36 Twp: 5S 96W Footage: 995 FNL  1579 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96W Footage: 995 FNL  1579 FEL
Proposed Depth/Form:10198 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/11/2007
Spud Date:4/18/2007Spud Date Is:ACTUAL
Measured TD:9010 ft.Measured PB depth:8950 ft.
True Vertical TD:8816 ft.True Vertical PB depth:8756 ft.
Top PZ Location:Sec:36 Twp: 5S 96WFootage: 995 FNL  1579 FEL
Bottom Hole Location:Sec:36 Twp: 5S 96WFootage: 995 FNL  1579 FEL
Log Types:
Log Types:MUD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2503 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 663, Top: 0 ft., Bottom: 2520 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8995 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1209, Top: 2966 ft., Bottom: 9010 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5217 ft.8788 ft.NN
ROLLINS8788 ft.9010 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/25/2007                Interval Top: 5278 ft.    Interval Bottom: 8693 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/19/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/27/2007
Treatment Summary:STAGES 01-09 TREATED W/A TOTAL OF: 33036 BBLS SLICKWATER, 888237# 20/40 SAND, 370647# 30/50 SAND & 36 BBLS 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:6417 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/25/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 771
MCF_GAS 509
TUBING_PRESS 380
Perforation Data:
Interval Top:5278 ft.# Of Holes:270
Interval Bottom:8693 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)47
Total Gas Produced (MCF)8574
GOR182425
GOR DeterminationMCFE
Average BOE per Day4.174
Average MCFE per Day24.207

 Federal Financial Assurance  i 

 Tribal Well  i No