Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13792
Well Classification: GW Status: SI - 11/1/2025
Well Name/No:FEDERAL #5-14C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 58670
Facility Status:SIStatus Date11/1/2025
FacilityID:289510LocationID:334081
County:GARFIELD #045Location:NENW 8 8S95W 6
Field:PARACHUTE - #67350Elevation:6413 ft.
Basin:PICEANCE BASIN  
Planned Location:549FNL  1624 FWLLat/Long: 39.383649 / -108.021645Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.383649 / -108.021644Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2025             Measured TD: 7218 ft.    Vertical TD: 6691 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20070429 Expiration Date:2/27/2008
Proposed Top PZ Location:Sec:8 Twp: 8S 95W Footage: 489 FNL  761 FWL
Bottom Hole Location:Sec:8 Twp: 8S 95W Footage: 489 FNL  761 FWL
Proposed Depth/Form:7626 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-59 , Unit Acreage: 19, Drill Unit: LOT 8
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-53 , Unit Acreage: 19, Drill Unit: LOT 8

Wellbore Completed
Completion Date:10/26/2007
Spud Date:6/1/2007Spud Date Is:ACTUAL
Measured TD:7218 ft.Measured PB depth:7090 ft.
True Vertical TD:6691 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 8S 95WFootage: 489 FNL  761 FWL
Bottom Hole Location:Sec:8 Twp: 8S 95WFootage: 489 FNL  761 FWL
Log Types:CBL/RMT
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1524 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 0 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7192 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 3562 ft., Bottom: 7192 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4072 ft.NN
CAMEO6516 ft.NN
ROLLINS6891 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 5072 ft.    Interval Bottom: 6226 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/27/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/25/2007
Treatment Summary:FRAC'D W/3000 GAL 7.5% HCL ACID; 6681 BBLS 2%; 3349 SX OTTAWA 30/50 WHITE SAND..
Tubing Size:2.375 in.Tubing Setting Depth:6667 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/12/2007Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 0
BTU_GAS 1068
CALC_BBLS_H2O 80
CALC_BBLS_OIL 0
CALC_MCF_GAS 1290
CASING_PRESS 1120
MCF_GAS 1290
TUBING_PRESS 850
Perforation Data:
Interval Top:5072 ft.# Of Holes:202
Interval Bottom:6226 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.022

 Federal Financial Assurance  i Y

 Tribal Well  i No