Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13777
Well Classification: GW Status: PR - 2/28/2007
Well Name/No:CHEVRON #GM 531-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/28/2007
FacilityID:289525LocationID:335654
County:GARFIELD #045Location:NWNE 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5599 ft.
Basin:PICEANCE BASIN  
Planned Location:811FNL  2276 FELLat/Long: 39.529479 / -108.130125Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.529483 / -108.130118Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/22/2007             Measured TD: 7195 ft.    Vertical TD: 7161 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/22/2007
Wellbore PermitDIRECTIONAL
Permit #:20070357 Expiration Date:2/27/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1211 FNL  1881 FEL
Bottom Hole Location:Sec:17 Twp: 6S 96W Footage: 1211 FNL  1881 FEL
Proposed Depth/Form:7222 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:6/10/2007
Spud Date:6/1/2007Spud Date Is:ACTUAL
Measured TD:7195 ft.Measured PB depth:7010 ft.
True Vertical TD:7161 ft.True Vertical PB depth:
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 1210 FNL  1964 FEL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 1210 FNL  1964 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1117 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1117 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7182 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 842, Top: 2080 ft., Bottom: 7182 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2145 ft.NN
MESAVERDE3882 ft.NN
CAMEO6582 ft.NN
ROLLINS7044 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/15/2007                 Interval Top: 5332 ft.    Interval Bottom: 6958 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/5/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2007
Treatment Summary:3766 GALS 7 1/2% HCL; 888300 # 30/50 SAND; 32867 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:6285 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1935
MCF_GAS 1229
TUBING_PRESS 1713
Perforation Data:
Interval Top:5332 ft.# Of Holes:128
Interval Bottom:6958 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)12438
GOR621900
GOR DeterminationMCFE
Average BOE per Day5.936
Average MCFE per Day34.413

 Federal Financial Assurance  i 

 Tribal Well  i No