Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13748
Well Classification: GW Status: PR - 2/8/2022
Well Name/No:CHEVRON #GM 532-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC023794
Facility Status:PRStatus Date2/8/2022
FacilityID:289398LocationID:335260
County:GARFIELD #045Location:LOT 3 29 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5849 ft.
Basin:PICEANCE BASIN  
Planned Location:1544FNL  855 FWLLat/Long: 39.498154 / -108.138798Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498153 / -108.138798Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/28/2021
End Date: 1/7/2022
Reported: 2/22/2022
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/8/2022             Measured TD: 7110 ft.    Vertical TD: 6979 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/8/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/27/2022
Proposed Top PZ Location:Sec:29 Twp: 6S 96W Footage: 2122 FNL  1666 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96W Footage: 2122 FNL  1666 FWL
Proposed Depth/Form:7118 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7118 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 566, Top: 3780 ft., Bottom: 7118 ft.

Wellbore Completed
Completion Date:11/4/2021
Spud Date:11/1/2021Spud Date Is:ACTUAL
Measured TD:7110 ft.Measured PB depth:7061 ft.
True Vertical TD:6979 ft.True Vertical PB depth:6931 ft.
Top PZ Location:Sec:29 Twp: 6S 96WFootage: 2107 FNL  1681 FWL
Bottom Hole Location:Sec:29 Twp: 6S 96WFootage: 2152 FNL  1621 FWL
Log Types:CBL, (RES in API 045-13746)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 199, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1048 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 0 ft., Bottom: 1048 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7100 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 731, Top: 3887 ft., Bottom: 7110 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WASATCH G2269 ft.NN
OHIO CREEK4014 ft.NN
WILLIAMS FORK4546 ft.NN
CAMEO6472 ft.NN
ROLLINS7010 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/8/2022                  Interval Top: 5094 ft.    Interval Bottom: 6981 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/8/2022Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/28/2021Treatment End Date:1/7/2022
Treatment Summary:44,918 BBLs of Slickwater; 1,313 gals of Biocide
Total fluid used in treatment (bbls):44950Max pressure during treatment (psi):7101
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):44918Total flowback volume recovered (bbls):14722
Fresh water used in treatment (bbls):31Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6808 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/8/2022Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 1809
CASING_PRESS 1039
MCF_GAS 1809
TUBING_PRESS 1074
Perforation Data:
Interval Top:5094 ft.# Of Holes:264
Interval Bottom:6981 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)74
Total Gas Produced (MCF)59240
GOR800540
GOR DeterminationMCFE
Average BOE per Day28.208
Average MCFE per Day163.615

 Federal Financial Assurance  i Y

 Tribal Well  i No