Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13742
Well Classification: GW Status: PR - 1/20/2022
Well Name/No:CHEVRON #GM 32-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date1/20/2022
FacilityID:289404LocationID:335260
County:GARFIELD #045Location:LOT 3 29 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5849 ft.
Basin:PICEANCE BASIN  
Planned Location:1534FNL  826 FWLLat/Long: 39.498181 / -108.138898Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498180 / -108.138899Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/13/2021
End Date: 12/23/2021
Reported: 1/31/2022
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/20/2022             Measured TD: 7557 ft.    Vertical TD: 6840 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/20/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/27/2022
Proposed Top PZ Location:Sec:30 Twp: 6S 96W Footage: 1478 FNL  1676 FEL
Bottom Hole Location:Sec:30 Twp: 6S 96W Footage: 1478 FNL  1676 FEL
Proposed Depth/Form:7604 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7584 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 581, Top: 4161 ft., Bottom: 7584 ft.

Wellbore Completed
Completion Date:10/18/2021
Spud Date:10/14/2021Spud Date Is:ACTUAL
Measured TD:7557 ft.Measured PB depth:7509 ft.
True Vertical TD:6840 ft.True Vertical PB depth:6793 ft.
Top PZ Location:Sec:30 Twp: 6S 96WFootage: 1450 FNL  1599 FEL
Bottom Hole Location:Sec:30 Twp: 6S 96WFootage: 1460 FNL  1674 FEL
Log Types:CBL, (RES in API 045-13746)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 83 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 196, Top: 0 ft., Bottom: 83 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1024 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 0 ft., Bottom: 1024 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7547 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 749, Top: 3018 ft., Bottom: 7557 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WASATCH G2578 ft.NN
OHIO CREEK4475 ft.NN
WILLIAMS FORK5017 ft.NN
CAMEO6955 ft.NN
ROLLINS7453 ft.NN

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 1/20/2022                 Interval Top: 5551 ft.    Interval Bottom: 7408 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/20/2022Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/13/2021Treatment End Date:12/23/2021
Treatment Summary:88,401 BBLs of Slickwater; 2,777 gals of Biocide
Total fluid used in treatment (bbls):88467Max pressure during treatment (psi):6859
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):88401Total flowback volume recovered (bbls):33176
Fresh water used in treatment (bbls):66Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7226 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2022Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 1989
CASING_PRESS 1441
MCF_GAS 1989
TUBING_PRESS 1368
Perforation Data:
Interval Top:5551 ft.# Of Holes:264
Interval Bottom:7408 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)334
Total Gas Produced (MCF)179163
GOR536416
GOR DeterminationMCFE
Average BOE per Day85.616
Average MCFE per Day496.566

 Federal Financial Assurance  i Y

 Tribal Well  i No