|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 9703 ft. Vertical TD: 9676 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20075817 | Expiration Date: | 12/3/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 200 FSL 2300 FEL | | Bottom Hole Location: | Sec:29 Twp: 5S 96W | Footage: 200 FSL 2300 FEL | | Proposed Depth/Form: | 9545 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 8/3/2008 | | Spud Date: | 7/20/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 9703 ft. | Measured PB depth: | 9628 ft. | | True Vertical TD: | 9676 ft. | True Vertical PB depth: | 9601 ft. | | Top PZ Location: | Sec:29 Twp: 5S 96W | Footage: 215 FSL 1796 FEL | | Bottom Hole Location: | Sec:29 Twp: 5S 96W | Footage: 215 FSL 1796 FEL | | Log Types: | RST, FES, CBL, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 120 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2338 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1522, Top: 0 ft., Bottom: 2338 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9673 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 801, Top: 2500 ft., Bottom: 9673 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OHIO CREEK | 6397 ft. | | N | N | | WILLIAMS FORK | 6657 ft. | | N | N | | CAMEO | 9097 ft. | | N | N | | ROLLINS | 9472 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 7252 ft. Interval Bottom: 9339 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/11/2008 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/20/2010 | | Treatment Summary: | 11/7/2008 - Frac stages 1-3
Stage 1 - 9,124'-9,339' @ 2 spf (20 holes total) using 78,020 lbs 20/40 white sand and 2,271 bbls slickwater fluid. Led with 750 gal. 7.5% acid.
Stage 2 - 8,913'-9,067' @ 2 spf (20 holes total) using 70,672 lbs 20/40 white sand and 2,226 bbls slickwater fluid. Led with 750 gal. 7.5% acid.
Stage 3 - 8,555'-8,715; @ 2 spf (20 holes total) using 72,714 lbs 20/40 white sand and 2,049 bbls slickwater fluid. Led with 750 gal 7.5% acid.
2/20/2010 - Frac stages 4-7
Stage 4 - 8,309'-8,458' @ 2 spf (30 holes total) using 86,773 lbs 30/50 white sand and 6,742 bbls slickwater fluid. Led with 500 gal. 7.5% acid.
Stage 5 - 8,013-8,271' @ 2 spf (30 holes total) using 159,506 lbs 30/50 white sand and 12,608 bbls slickwater fluid. Led with 500 gal. 7.5% acid.
Stage 6 - 7,769'-7,979' @ 2 spf (30 holes total) using 86,429 lbs 30/50 white sand and 6,802 bbls slickwater fluid. Led with 500 gal. 7.5% acid.
Stage 7 - 7,503'-7,727' @ 2 spf (30 holes total) using 146,787 lbs 30/50 white sand and 11,352 bbls slickwater fluid. Led with 500 gal. 7.5% acid.
3/2/2010 - Perf stage 8
Stage 8 - 7,252'-7,460' @ 2 spf (30 Holes) | | Formation Treatment | | Treatment Date: | 11/3/2008 | | Treatment Summary: | WELL FRAC'D IN 3 STAGES USING 6613 BBLS SLICKWATER AND 221406 LBS 20/40 WHITE SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/7/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 298 | | BTU_GAS | 1065 | | CALC_BBLS_H2O | 298 | | CALC_MCF_GAS | 2900 | | CASING_PRESS | 1240 | | MCF_GAS | 2900 |
| | Perforation Data: | | Interval Top: | 7252 ft. | # Of Holes: | 210 | | Interval Bottom: | 9339 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 8 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.003 |
| Average MCFE per Day | 0.022 |
| Federal Financial Assurance | i | |
|
|