Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13610
Well Classification: GW Status: PR - 1/10/2007
Well Name/No:DERE/JENSEN #PA413-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/10/2007
FacilityID:288858LocationID:334772
County:GARFIELD #045Location:SWSW 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5122 ft.
Basin:PICEANCE BASIN  
Planned Location:1165FSL  755 FWLLat/Long: 39.476850 / -107.972501Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476861 / -107.972514Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2006             Measured TD: 7209 ft.    Vertical TD: 7164 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2006
Wellbore PermitDIRECTIONAL
Permit #:20066182 Expiration Date:1/8/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1747 FSL  542 FWL
Bottom Hole Location:Sec:35 Twp: 6S 95W Footage: 1747 FSL  542 FWL
Proposed Depth/Form:7249 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:6/24/2007
Spud Date:6/17/2007Spud Date Is:ACTUAL
Measured TD:7209 ft.Measured PB depth:7110 ft.
True Vertical TD:7164 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 95WFootage: 1749 FSL  540 FWL
Bottom Hole Location:Sec:35 Twp: 6S 95WFootage: 1749 FSL  540 FWL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD. UPLOADED LAS FILES ON 10-22-07
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1626 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1626 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7198 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 2150 ft., Bottom: 7198 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1440 ft.NN
MESAVERDE3718 ft.NN
CAMEO6386 ft.NN
ROLLINS7085 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/20/2007                Interval Top: 5158 ft.    Interval Bottom: 7006 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/19/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/16/2007
Treatment Summary:3500 GALS 7 1/2% HCL; 791,800# 30/50 SAND; 22,043 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6547 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1072
CASING_PRESS 1445
MCF_GAS 1138
TUBING_PRESS 1342
Perforation Data:
Interval Top:5158 ft.# Of Holes:127
Interval Bottom:7006 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)14680
GOR863529
GOR DeterminationMCFE
Average BOE per Day6.980
Average MCFE per Day40.509

 Federal Financial Assurance  i 

 Tribal Well  i No