Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13548
Well Classification: GW Status: PR - 7/27/2005
Well Name/No:PUCKET #GM 228-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 50759
Facility Status:PRStatus Date7/27/2005
FacilityID:275467LocationID:335366
County:GARFIELD #045Location:SENW 34 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5457 ft.
Basin:PICEANCE BASIN  
Planned Location:2045FNL  2427 FWLLat/Long: 39.482148 / -108.095416Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.482335 / -108.095350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/27/2005             Measured TD: 6711 ft.    Vertical TD: 6659 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/27/2005
Wellbore PermitDIRECTIONAL
Permit #:20043124 Expiration Date:1/2/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1480 FNL  2142 FWL
Bottom Hole Location:Sec: Twp: Footage: 1480 FNL  2142 FWL
Proposed Depth/Form:6794 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:5/1/2005
Spud Date:3/22/2005Spud Date Is:ACTUAL
Measured TD:6711 ft.Measured PB depth:6711 ft.
True Vertical TD:6659 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1480 FNL  2142 FWL
Bottom Hole Location:Sec: Twp: Footage: 1480 FNL  2142 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1115 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1115 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6698 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 3200 ft., Bottom: 6697 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1814 ft.NN
FORT UNION2141 ft.NN
MESAVERDE3588 ft.NN
CAMEO6217 ft.NN
ROLLINS6647 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/27/2005                 Interval Top: 4818 ft.    Interval Bottom: 6535 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.234 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/1/2005
Treatment Summary:4250 GALS 7 1/2% HCL, 973700# 30/50, 18528 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:5883 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/28/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 908
CASING_PRESS 1241
MCF_GAS 908
TUBING_PRESS 1104
Perforation Data:
Interval Top:4818 ft.# Of Holes:110
Interval Bottom:6535 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)11872
GOR742000
GOR DeterminationMCFE
Average BOE per Day5.649
Average MCFE per Day32.804

 Federal Financial Assurance  i 

 Tribal Well  i No