Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13522
Well Classification: GW Status: PR - 7/6/2005
Well Name/No:PA #422-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62162
Facility Status:PRStatus Date7/6/2005
FacilityID:275335LocationID:334965
County:GARFIELD #045Location:SENW 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5157 ft.
Basin:PICEANCE BASIN  
Planned Location:1934FNL  1981 FWLLat/Long: 39.468819 / -108.041884Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.468686 / -108.042183Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/6/2005             Measured TD: 6480 ft.    Vertical TD: 6478 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/6/2005
Wellbore PermitDIRECTIONAL
Permit #:20043026 Expiration Date:12/27/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2004 FNL  1892 FWL
Bottom Hole Location:Sec: Twp: Footage: 2004 FNL  1892 FWL
Proposed Depth/Form:6562 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:4/21/2005
Spud Date:2/21/2005Spud Date Is:ACTUAL
Measured TD:6480 ft.Measured PB depth:6450 ft.
True Vertical TD:6478 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2004 FNL  1892 FWL
Bottom Hole Location:Sec: Twp: Footage: 2004 FNL  1892 FWL
Log Types:HIGH RESOLUTION INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 0 ft., Bottom: 1650 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6580 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 2540 ft., Bottom: 6580 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1426 ft.NN
FORT UNION1750 ft.NN
MESAVERDE3401 ft.NN
CAMEO5911 ft.NN
ROLLINS6403 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/6/2005                  Interval Top: 3902 ft.    Interval Bottom: 6344 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/21/2005
Treatment Summary:4750 GALS 7 1/2% HCL, 740100# 30/50 SAND, 15701 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:3817 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1208
CASING_PRESS 1399
MCF_GAS 1208
TUBING_PRESS 1374
Perforation Data:
Interval Top:3902 ft.# Of Holes:130
Interval Bottom:6344 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)9988
GOR908000
GOR DeterminationMCFE
Average BOE per Day4.748
Average MCFE per Day27.578

 Federal Financial Assurance  i 

 Tribal Well  i No