Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13454
Well Classification: OW Status: PR - 8/29/2005
Well Name/No:PUCKETT #GM 513-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/29/2005
FacilityID:275027LocationID:335372
County:GARFIELD #045Location:SWNW 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5850 ft.
Basin:PICEANCE BASIN  
Planned Location:2413FNL  1070 FWLLat/Long: 39.480988 / -108.137937Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.481088 / -108.137870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/29/2005             Measured TD: 6653 ft.    Vertical TD: 6522 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/29/2005
Wellbore PermitDIRECTIONAL
Permit #:20042834 Expiration Date:12/5/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1858 FSL  769 FWL
Bottom Hole Location:Sec: Twp: Footage: 1858 FSL  769 FWL
Proposed Depth/Form:6834 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:6/29/2005
Spud Date:5/3/2005Spud Date Is:ACTUAL
Measured TD:6653 ft.Measured PB depth:6545 ft.
True Vertical TD:6522 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1858 FSL  769 FWL
Bottom Hole Location:Sec: Twp: Footage: 1858 FSL  769 FWL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1110 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1109 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6628 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 3530 ft., Bottom: 6627 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G2109 ft.NN
FORT UNION2396 ft.NN
MESAVERDE3667 ft.NN
CAMEO6172 ft.NN
ROLLINS6663 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 8/29/2005                 Interval Top: 5030 ft.    Interval Bottom: 6413 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2005
Treatment Summary:4500 GALS 7 1/2% HCL, 638400# 30/50, 15454 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6271 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1244
CASING_PRESS 1318
MCF_GAS 1244
TUBING_PRESS 1227
Perforation Data:
Interval Top:5030 ft.# Of Holes:99
Interval Bottom:6413 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)2
Total Gas Produced (MCF)2274
GOR1137000
GOR DeterminationMCFE
Average BOE per Day1.090
Average MCFE per Day6.305

 Federal Financial Assurance  i 

 Tribal Well  i No