Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13444
Well Classification: GW Status: PR - 5/20/2005
Well Name/No:WEBSTER HILL/HEATH #RWF 532-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/20/2005
FacilityID:274938LocationID:335270
County:GARFIELD #045Location:SWNE 28 6S94W 6
Field:RULISON - #75400Elevation:5330 ft.
Basin:PICEANCE BASIN  
Planned Location:2012FNL  1993 FELLat/Long: 39.497859 / -107.890700Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.497976 / -107.890792Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/20/2005             Measured TD: 7660 ft.    Vertical TD: 7631 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/20/2005
Wellbore PermitDIRECTIONAL
Permit #:20042758 Expiration Date:12/1/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2386 FNL  2365 FEL
Bottom Hole Location:Sec: Twp: Footage: 2386 FNL  2365 FEL
Proposed Depth/Form:7734 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:2/24/2005
Spud Date:1/10/2005Spud Date Is:ACTUAL
Measured TD:7660 ft.Measured PB depth:7634 ft.
True Vertical TD:7631 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2386 FNL  2365 FEL
Bottom Hole Location:Sec: Twp: Footage: 2386 FNL  2365 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1094 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1093 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7680 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 3500 ft., Bottom: 7679 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1532 ft.NN
MESAVERDE4006 ft.NN
CAMEO6713 ft.NN
ROLLINS7625 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/20/2005                 Interval Top: 5360 ft.    Interval Bottom: 7542 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/24/2005
Treatment Summary:3000 GALS 7 1/2% HCL 699800# 30/50, 16072 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6546 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 880
CASING_PRESS 1125
MCF_GAS 880
TUBING_PRESS 607
Perforation Data:
Interval Top:5360 ft.# Of Holes:112
Interval Bottom:7542 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)13654
GOR853375
GOR DeterminationMCFE
Average BOE per Day6.491
Average MCFE per Day37.677

 Federal Financial Assurance  i 

 Tribal Well  i No