Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13415
Well Classification: GW Status: PR - 10/25/2004
Well Name/No:PA #424-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/25/2004
FacilityID:274837LocationID:335406
County:GARFIELD #045Location:SESW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5595 ft.
Basin:PICEANCE BASIN  
Planned Location:378FSL  1750 FWLLat/Long: 39.489299 / -108.006413Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.489305 / -108.006398Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/25/2004             Measured TD: 7496 ft.    Vertical TD: 7469 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/25/2004
Wellbore PermitDIRECTIONAL
Permit #:20042665 Expiration Date:11/22/2005
Proposed Top PZ Location:Sec: Twp: Footage: 135 FSL  2190 FWL
Bottom Hole Location:Sec: Twp: Footage: 135 FSL  2190 FWL
Proposed Depth/Form:7569 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:4/1/2005
Spud Date:2/27/2005Spud Date Is:ACTUAL
Measured TD:7496 ft.Measured PB depth:7460 ft.
True Vertical TD:7469 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 135 FSL  2190 FWL
Bottom Hole Location:Sec: Twp: Footage: 135 FSL  2190 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2126 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 562, Top: 0 ft., Bottom: 2126 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7483 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 3840 ft., Bottom: 7483 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1887 ft.NN
FORT UNION2184 ft.NN
MESAVERDE4064 ft.NN
CAMEO COAL6712 ft.NN
ROLLINS7419 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  CM - 4/26/2005                 Interval Top: 5513 ft.    Interval Bottom: 7340 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/26/2005Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/2005
Treatment Summary:3750 GAL 7 1/2% HCL, 545300# 30/50, 13368 BBL SLIKC WATER
Tubing Size:2.375 in.Tubing Setting Depth:6955 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/26/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1239
CASING_PRESS 1534
MCF_GAS 1239
TUBING_PRESS 1404
Perforation Data:
Interval Top:5513 ft.# Of Holes:95
Interval Bottom:7340 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)13635
GOR802058
GOR DeterminationMCFE
Average BOE per Day6.492
Average MCFE per Day37.643

 Federal Financial Assurance  i 

 Tribal Well  i No