Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13411
Well Classification: GW Status: PR - 2/6/2006
Well Name/No:PA #514-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/6/2006
FacilityID:274843LocationID:335436
County:GARFIELD #045Location:NWSW 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5314 ft.
Basin:PICEANCE BASIN  
Planned Location:2106FSL  226 FWLLat/Long: 39.479579 / -107.993023Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479232 / -107.992946Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/6/2006             Measured TD: 7076 ft.    Vertical TD: 6968 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/6/2006
Wellbore PermitDIRECTIONAL
Permit #:20054003 Expiration Date:11/27/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1270 FSL  673 FWL
Bottom Hole Location:Sec: Twp: Footage: 1270 FSL  673 FWL
Proposed Depth/Form:7215 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:11/28/2005
Spud Date:11/18/2005Spud Date Is:ACTUAL
Measured TD:7076 ft.Measured PB depth:6984 ft.
True Vertical TD:6968 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 6S 95WFootage: 1282 FSL  689 FWL
Bottom Hole Location:Sec:34 Twp: 6S 95WFootage: 1282 FSL  689 FWL
Log Types:CBL; RESERVOIR MONITOR TOLL ELITE; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1687 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 455, Top: 0 ft., Bottom: 1687 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7041 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 2900 ft., Bottom: 7041 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1478 ft.NN
FORT UNION1853 ft.NN
MESAVERDE3715 ft.NN
CAMEO6348 ft.NN
ROLLINS7009 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/6/2006                  Interval Top: 4950 ft.    Interval Bottom: 6872 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/8/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2006
Treatment Summary:1/6/06 1539 GALS 7 1/2% HCL; 3250 GALS 10% ACETIC ACID; 770400# 30/50 SAND; 18371 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6556 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1591
CASING_PRESS 1780
TUBING_PRESS 1680
Perforation Data:
Interval Top:4950 ft.# Of Holes:139
Interval Bottom:6872 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)22896
GOR817714
GOR DeterminationMCFE
Average BOE per Day10.891
Average MCFE per Day63.180

 Federal Financial Assurance  i 

 Tribal Well  i No