Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13400
Well Classification: GW Status: PR - 10/21/2004
Well Name/No:PA #414-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/21/2004
FacilityID:274806LocationID:334970
County:GARFIELD #045Location:SWSW 33 6S95W 6
Field:PARACHUTE - #67350Elevation:5159 ft.
Basin:PICEANCE BASIN  
Planned Location:1193FSL  339 FWLLat/Long: 39.477049 / -108.011193Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.477061 / -108.011158Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/21/2004             Measured TD: 6765 ft.    Vertical TD: 6625 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/21/2004
Wellbore PermitDIRECTIONAL
Permit #:20042646 Expiration Date:11/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 235 FSL  601 FWL
Bottom Hole Location:Sec: Twp: Footage: 235 FSL  601 FWL
Proposed Depth/Form:6812 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: SW/4

Wellbore Completed
Completion Date:6/19/2005
Spud Date:6/2/2005Spud Date Is:ACTUAL
Measured TD:6765 ft.Measured PB depth:6562 ft.
True Vertical TD:6625 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 235 FSL  601 FWL
Bottom Hole Location:Sec: Twp: Footage: 235 FSL  601 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1498 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 1498 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6751 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 3450 ft., Bottom: 6751 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1288 ft.NN
FORT UNION1564 ft.NN
MESAVERDE3408 ft.NN
CAMEO5914 ft.NN
ROLLINS6579 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/20/2006                 Interval Top: 4712 ft.    Interval Bottom: 6513 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/19/2005
Treatment Summary:7/19/05 COBRAMAX TREATMENT 90 SAND JET PERFORATIONS, 4200 GALS 7.5% HCL ACID; 775000# 20/40 SAND, 17497 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6312 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 834
MCF_GAS 833
TUBING_PRESS 641
Perforation Data:
Interval Top:4712 ft.# Of Holes:90
Interval Bottom:6513 ft.Hole Size:0.75 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)20436
GOR756888
GOR DeterminationMCFE
Average BOE per Day9.735
Average MCFE per Day56.458

 Federal Financial Assurance  i 

 Tribal Well  i No