Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13397
Well Classification: GW Status: PR - 4/8/2005
Well Name/No:PA #432-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/8/2005
FacilityID:274809LocationID:335392
County:GARFIELD #045Location:SWNE 33 6S95W 6
Field:PARACHUTE - #67350Elevation:5444 ft.
Basin:PICEANCE BASIN  
Planned Location:1722FNL  1663 FELLat/Long: 39.483529 / -107.999723Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.483585 / -107.999698Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/8/2005             Measured TD: 7311 ft.    Vertical TD: 7224 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/8/2005
Wellbore PermitDIRECTIONAL
Permit #:20042643 Expiration Date:11/21/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1345 FNL  2476 FEL
Bottom Hole Location:Sec: Twp: Footage: 1345 FNL  2476 FEL
Proposed Depth/Form:7407 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NE/4

Wellbore Completed
Completion Date:3/3/2005
Spud Date:1/10/2005Spud Date Is:ACTUAL
Measured TD:7311 ft.Measured PB depth:7250 ft.
True Vertical TD:7224 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1345 FNL  2476 FEL
Bottom Hole Location:Sec: Twp: Footage: 1345 FNL  2476 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1874 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 0 ft., Bottom: 1873 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7298 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 881, Top: 3410 ft., Bottom: 7297 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1672 ft.NN
FORT UNION1954 ft.NN
MESAVERDE3897 ft.NN
CAMEO6516 ft.NN
ROLLINS7227 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/8/2005                  Interval Top: 5131 ft.    Interval Bottom: 7139 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2005
Treatment Summary:4000 GALS 7 1/2% HCL, 504500# 30/50, 11300 BBLS SLICKWATER, 6698-7139' 1000 GALS 7.5% HCL 101000# 30/50 SAND & 2474 BBLS SLICKWATER, 6318-6609' 750 GALS 7.5% HCL; 86300# 30/50 SAND&2125 BBLS SLICKWATER, 5925-6210' 750 GALS 7.5% HCL; 106000# 30/50 SAND &
Tubing Size:2.375 in.Tubing Setting Depth:6730 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 946
CASING_PRESS 1031
TUBING_PRESS 916
Perforation Data:
Interval Top:5131 ft.# Of Holes:90
Interval Bottom:7139 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)10099
GOR918090
GOR DeterminationMCFE
Average BOE per Day4.809
Average MCFE per Day27.887

 Federal Financial Assurance  i 

 Tribal Well  i No