|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: Status: AB - 9/3/2005 Measured TD: | Wellbore Data for Original Wellbore | Wellbore Classification: AB - 9/3/2005 | | Wellbore Permit | | | Permit #: | 20042578 | Expiration Date: | 11/21/2005 | | Proposed Depth/Form: | 9250 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 32 in., Size: 20 in., Top: , Depth: 100 ft., Weight: 53 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2850 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 900, Top: 0 ft., Bottom: 2850 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 8950 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 5550 ft., Bottom: 8950 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 6/11/2005 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 2724 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 2724 ft., Determination Method: |
Formation WFCM Formation Classification: GW Status: AB - 9/3/2005 Interval Top: 6660 ft. Interval Bottom: 8566 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/8/2005 | Choke Size: | 0.250 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/6/2005 | | Treatment Summary: | BJ SERVICES FRACED USING 8546 BBL OF 20# LIGHTING HT GEL, 803,230 # OF 20/40 FRAC SAND, AND 213,635# OF SUPER LC 20/40 RESIN COATED SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8321 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/8/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 1 | | BTU_GAS | 1080 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 275000 | | CALC_MCF_GAS | 275 | | CASING_PRESS | 1672 | | MCF_GAS | 275 | | TUBING_PRESS | 1341 |
| | Perforation Data: | | Interval Top: | 6660 ft. | # Of Holes: | 108 | | Interval Bottom: | 8566 ft. | Hole Size: | 0.34 in. |
|
Sidetrack #01 Wellbore Classification: GW Status: SI - 10/1/2025 Measured TD: 8946 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW SI - 10/1/2025 | | Wellbore Permit | | | Permit #: | 20064423 | Expiration Date: | 9/6/2007 | | Proposed Depth/Form: | 9250 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/15/2005 | | Spud Date: | 6/11/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8946 ft. | Measured PB depth: | 8845 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | PULSED NEUTRON, TEMPERATURE, CBL, PND-S CASED HOLE TCOMBO | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2724 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 2724 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8845 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1200, Top: 5400 ft., Bottom: 8845 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4176 ft. | | N | N | | FORT UNION | 4570 ft. | | N | N | | WILLIAMS FORK | 5763 ft. | | N | N | | CAMEO | 8318 ft. | | N | N | | ROLLINS | 8763 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: SI - 10/1/2025 Interval Top: 6660 ft. Interval Bottom: 8566 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/8/2008 | Choke Size: | 0.250 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/15/2005 | | Treatment Summary: | BJ SERVICES FRACED USING 8546 BBL OF 20# LIGHTING HT GEL, 803,230# OF 20/40 FRAC SAND, AND 213,635# OF SUPER LC 20/40 RESIN COATED SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8321 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/8/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 1 | | BTU_GAS | 1080 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 275000 | | CALC_MCF_GAS | 275 | | CASING_PRESS | 1672 | | MCF_GAS | 275 | | TUBING_PRESS | 1341 |
| | Perforation Data: | | Interval Top: | 6660 ft. | # Of Holes: | 108 | | Interval Bottom: | 8566 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 15 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.008 |
| Average MCFE per Day | 0.042 |
| Federal Financial Assurance | i | |
|
|