|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 10720 ft. Vertical TD: 10550 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20042567 | Expiration Date: | 11/14/2005 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2310 FNL 2310 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 2310 FNL 2310 FEL | | Proposed Depth/Form: | 11532 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/13/2005 | | Spud Date: | 12/7/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 10720 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 10550 ft. | True Vertical PB depth: | 0 ft. | | Top PZ Location: | Sec: Twp: | Footage: 2310 FNL 2310 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 2310 FNL 2310 FEL | | Log Types: | MUD, RST, DIPOLE SONIC IMAGER, CBL, ARRAY INDUCTION | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2284 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 990, Top: 0 ft., Bottom: 2283 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9146 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1650, Top: 2450 ft., Bottom: 9146 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 2450 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 645, Top: 1050 ft., Bottom: 2450 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 3932 ft. | 5264 ft. | N | N | | WILLIAMS FORK | 5264 ft. | 8746 ft. | N | N | | ROLLINS | 8746 ft. | 9002 ft. | N | N | | COZZETTE | 9002 ft. | 9162 ft. | N | N | | CORCORAN | 9162 ft. | 9386 ft. | N | N | | SEGO | 9386 ft. | 10720 ft. | N | N |
Formation WMFK Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 5714 ft. Interval Bottom: 8325 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 8/8/2005 | Choke Size: | 0.750 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/13/2005 | | Treatment Summary: | STAGES 1-7 TREATED WITH A TOTAL OF 38,051 BBLS OF SLICKWATER, 979,092 LBS 20/40 SAND, 60 BBL 7/5% HCL, 31 7/8" 1.1 BALL SEALERS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7517 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/18/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 1946 | | CASING_PRESS | 850 | | MCF_GAS | 1946 | | TUBING_PRESS | 210 |
| | Perforation Data: | | Interval Top: | 5714 ft. | # Of Holes: | 153 | | Interval Bottom: | 8325 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.006 |
| Average MCFE per Day | 0.033 |
| Federal Financial Assurance | i | |
|
|