Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13356
Well Classification: GW Status: PR - 5/2/2005
Well Name/No:PA #532-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/2/2005
FacilityID:274470LocationID:334957
County:GARFIELD #045Location:SWNE 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5152 ft.
Basin:PICEANCE BASIN  
Planned Location:1460FNL  1874 FELLat/Long: 39.470029 / -108.037644Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.469905 / -108.037711Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/2/2005             Measured TD: 6667 ft.    Vertical TD: 6572 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/2/2005
Wellbore PermitDIRECTIONAL
Permit #:20042481 Expiration Date:10/28/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2316 FNL  1761 FEL
Bottom Hole Location:Sec: Twp: Footage: 2316 FNL  1761 FEL
Proposed Depth/Form:6641 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:3/8/2005
Spud Date:1/10/2005Spud Date Is:ACTUAL
Measured TD:6667 ft.Measured PB depth:6250 ft.
True Vertical TD:6572 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2316 FNL  1761 FEL
Bottom Hole Location:Sec: Twp: Footage: 2316 FNL  1761 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1115 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1114 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6666 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 2400 ft., Bottom: 6665 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1397 ft.NN
FORT UNION1719 ft.NN
MESAVERDE3456 ft.NN
CAMEO5974 ft.NN
ROLLINS6483 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/2/2005                  Interval Top: 4593 ft.    Interval Bottom: 5802 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.234 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2005
Treatment Summary:2500 GALS 7 1/2% HCL, 355100# 30/50, 8118 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5789 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/2/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1022
CASING_PRESS 1015
MCF_GAS 1022
TUBING_PRESS 92
Perforation Data:
Interval Top:4593 ft.# Of Holes:58
Interval Bottom:5802 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7580
GOR689090
GOR DeterminationMCFE
Average BOE per Day3.616
Average MCFE per Day20.963

 Federal Financial Assurance  i 

 Tribal Well  i No